Browse
Search
Agenda - 01-23-2007-5r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:21:47 AM
Creation date
8/28/2008 11:13:03 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5r
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Rosemary & Elliott Williams <br />Address: 2607 Overland Passage <br />City: Chapel Hill, N.C. 27516 <br />Phone: (919) 370-3552 <br />Date: November 8, 2006 <br />Interior: <br />Carpet & Painting: <br />1. Remove all carpet from the unit. <br />2. Remove the wallpaper from the master bathroom walls. Prepare <br />walls where wall paper was removed. Wash to remove all glue. <br />Fill all damaged areas with filler and sand. Prime with a Kilz type <br />primer. <br />Page 3 <br />3. Prepare all painted surfaces for paint. Clean walls and trim with a <br />mild cleaner. Prime all bare wood and sheetrock with a construction <br />primer. Repair all damaged areas in sheetrock with filler and sand <br />smooth. Caulk all cracks with a latex caulk. Fill all nail holes with <br />painters putty. Paint the walls with flat latex paint. Paint the trim with <br />semi-gloss latex paint. NOTE: Bathroom walls & trim to be painted <br />with semi-gloss latex paint. All paint to cover completely. _ <br />4. Install new carpet and pad on both floors. The CARPET to cost not less <br />than $ 14.00 sq. yard. Install a 6 pound pad. Install metal trim at all <br />door openings where carpet meets vinyl. Install carpet and pad in all <br />closets. Note: All carpet to be professionally installed. <br />Carpet to be re-installed in all locations where removed. <br />Price to include trimming the bottom of any doors that rub the new <br />carpet. <br />5. Prepare the front door unit for paint. Prime the front door with a <br />bonding primer. Paint the front door and jamb with semi-gloss latex <br />paint. The paint to cover completely. <br />Kitchen: <br />1. Remove all existing wall and base cabinets. Remove all existing <br />countellops. <br />2. Install new wall and base cabinets. Note: New cabinets to match <br />existing layout. Install factory made cabinets with hardwood face- <br />plates, doors and drawers. Price to include all hardware. Consult <br />homeowner for finish. (white or stained)
The URL can be used to link to this page
Your browser does not support the video tag.