Browse
Search
Agenda - 01-23-2007-5r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:21:47 AM
Creation date
8/28/2008 11:13:03 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5r
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Rosemary & Elliott Williams <br />Address: 2607 Overland Passage <br />City: Chapel Hill, N.C. 27516 <br />Phone: (919) 370-3552 <br />Date: November 8, 2006 <br />Roof & Gutters: <br />Install a new 25-year shingle roof. Remove existing shingles <br />to the sheathing. Remove all exposed nails and prepare roof <br />for felt paper. Install brown eve starter, 15 lb felt paper, vent boots <br />and 25 year shingles. Note: Refer to manufacture specifications for <br />installation. Note: Do not damage existing step flashing around <br />chimney and at gable walls. Install all necessary flashing around <br />both top and bottom sections of the chimney to prevent water <br />intrusion. <br />Page 2 <br />2. Install a shingle type ridge vent on all ridges. Note: Refer to <br />manufacture specifications for ridge vent installation. <br />3. Install continuous aluminum gutters and over-sized downspouts on <br />all fascias. Note: All downspouts shall be connected to solid drain- <br />tile that extends not less than ten (10) feet from the foundation wall. <br />Note: If at ten feet from foundation wall if positive drainage do not <br />exist, the drain tile must extend until positive drainage is met. <br />Note: Special hangers will be required due to style of boxing. _ <br />4. Install metal gutters guards on all gutters. <br />Wheelchair Ramp: <br />Remove the steps and handrails on the rear deck. Install a ramp <br />from the rear deck to a 5ft x 5ft landing centered over the sidewalk. <br />( Refer to Plan) Install a ramp from the landing toward the front <br />of the unit. The ramp width shall be 4ft in the clear. All wood <br />shall be pressure treated lumber. All nails and bolts shall be hot <br />dipped galvanized. Install 2x2 pickets placed 4" apart per code. <br />Install handrails on both sides of the ramp. All work to pass <br />inspection with the Orange County Inspection Dept. A permit <br />is required. _
The URL can be used to link to this page
Your browser does not support the video tag.