Browse
Search
Agenda - 01-23-2007-5r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:21:47 AM
Creation date
8/28/2008 11:13:03 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5r
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Rosemary & Elliott Williams <br />Address: 2607 Overland Passage <br />City: Chapel Hill, N.C. 27516 <br />Phone: (919) 370-3552 <br />Date: November 8, 2006 <br />Exterior: <br />1. Trim all trees limbs hanging over roof located on the right rear <br />corner. Limbs to be cut off at the tree. <br />2. Install a new garage door with hand opener/lock. New door to open <br />close and lock properly. Stain or paint door to match existing exterior <br />finish. Apply a waterproof finish over stain to protect finish and door. <br />NOTE: Existing hardware and track may be used. Install all necessary <br />framing to secure track properly. <br />3. Replace approximately 36ft of damaged and loose wood siding. <br />Note: All damaged siding to be replaced with new wood matching <br />siding. Secure all loose siding with galvanized nails. Stain new <br />siding with matching stain. <br />4. Prepare all windows and windows frames for matching paint/stain. <br />Remove all loose paint, spot sand smooth and paint. Apply all <br />necessary caulking to fill all cracks. All paint/stain to cover <br />completely. <br />5. Install a new pressure treated frame for the sewage pump station <br />located on the right rear corner. Install pressure treated framing and <br />% inch pressure treated plywood walls. Re-install the existing shingle. <br />top on the new frame. All nails shall be hot dipped galvanized. _ <br />6. Install a new door unit located on the left rear. Install a 6 panel <br />metal door unit with keyed lock and deadbolt. New door to open, <br />close and lock properly. Prime and paint door and frame to match <br />existing trim as close as possible. Note: Apply all necessary caulking <br />between brick-molding and siding. Install metal drip cap over door <br />frame to protect water intrusion. _ <br />7. Install a 2x8 header for the 36" door unit in the garage.
The URL can be used to link to this page
Your browser does not support the video tag.