Browse
Search
Agenda - 01-23-2007-5r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:21:47 AM
Creation date
8/28/2008 11:13:03 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5r
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 <br />Name: Mozelle Chavious <br />Address: 216 W. Union St. <br />City: Hillsborough, N.C. 27278 <br />Phone: 732-3173 <br />Date: August 7, 2006 <br />Left Rear Bedroom: <br />1. Install a new pre-hung 6-panel interior door unit with privacy lockset <br />and door bumper. Prime new door unit with an oil based primer. _ <br />2. Remove the flooring and floor joists. Note: Floor joists maybe <br />doubled in areas where unable to remove. Install matching 2x8 # 2 <br />pressure treated floor joists. New framing shall span from foundation <br />wall to center girder. Install all necessary blocking for new sub-floor. <br />Install % inch plywood sub-floor and 5/8 inch under-layment. <br />All framing to be approved by Orange County Inspection Dept. <br />Page 5 <br />3. Remove existing baseboard and shoe molding. Install 4'K inch <br />molded baseboard. Prime new baseboard with an oil based primer. <br />4. Prepare walls, trim and doors for paint. Repair all damaged areas of <br />sheetrock with filler and tape. Fill all holes and caulk all cracks. <br />Sand new filler smooth and prepare for primer. Clean walls and trim <br />and prime with a Kilz type bonding primer. Paint the sheetrock walls <br />with flat latex paint. Paint the block walls with an approved paint <br />for masonry. Paint the trim and doors with semi-gloss latex paint. <br />All paint to cover completely. _ <br />5. Install new carpet and pad. The carpet to cost not less than $ 14 <br />sq. yd. Install a minimum 6 pound pad. Install metal trim at door <br />opening. Carpet to be properly installed. Color to be approved <br />by homeowner. Note: Trim doors as necessary to clear carpet. <br />Right Rear Bedroom: <br />I. Install a 6-panel interior door unit with privacy lockset. New <br />door to open. close and lock properly. Prime new door unit with an <br />oil based primer. <br />2. Prepare the walls, trim and doors for paint. Repair all damaged <br />areas of sheetrock with filler and tape and corner bead. <br />Fill all holes and caulk all cracks. Sand new filler smooth <br />and prepare for paint. Paint the walls with flat latex paint. <br />Paint the block work with an approved paint for masonry. <br />Paint the doors and trim with semi-gloss latex paint.
The URL can be used to link to this page
Your browser does not support the video tag.