Browse
Search
Agenda - 01-23-2007-5r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:21:47 AM
Creation date
8/28/2008 11:13:03 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5r
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br />Name: Mozelle Chavious <br />Address: 216 W. Union St. <br />City: Hillsborough, N.C. 27278 <br />Phone: 732-3173 <br />Date: August 7, 2006 <br />Bathroom: <br />Page 4 <br />4. Reframe bathroom door opening to receive a 36" door unit. Install <br />new header and filler studs. Install a 36 inch 6 panel pre-hung interior <br />door unit. Door unit shall be complete with privacy lock and door <br />bumper. New door to open, close and lock properly. <br />5. Install %2" MR sheetrock on the walls and ceiling. Finish the <br />sheetrock smooth. Prime the sheetrock with a new sheetrock <br />primer. <br />6. Install a tub/shower surround. Install a water tight seal where <br />surround meets tub. Glue surround to sheetrock and block wall <br />using proper adhesive. Install proper water proof trim where <br />tub/shower surround meets the window. Caulk surround <br />at tub using 100% tub/shower silicone caulk. <br />7. Install two grab bars in the shower area. Install a 36 inch and <br />a 24 inch grab bar. Note install proper fasteners to support <br />grab bars. <br />Install 3 V4" molded baseboard in the bathroom. Prime the new <br />baseboard with an oil based primer. <br />9. Install a new vinyl floor in the bathroom. The vinyl to cost not less <br />than $ 14.00 sq. yd. Install new shoe molding and metal trim. Prime <br />shoe molding with an oil based primer. Caulk vinyl at tub area. _ <br />10. Install a five piece accessory kit in the bathroom. Kit to include <br />two, twenty four inch towel bars, a soap dish, tumbler holder and <br />paper holder. <br />11. Install a surface mount medicine cabinet. <br />12. Prepare all surfaces for paint. Paint the walls, ceiling, doors and <br />trim with semi-gloss latex paint. All paint shall cover completely.
The URL can be used to link to this page
Your browser does not support the video tag.