Orange County NC Website
DocuSign Envelope ID: C269DO8B-F3B7-4EA6-BDAO-2DE5B421 F45A <br /> FloorChem, Inc. 200 Powell Drive <br /> E-mail - floorchem @aol.com Suite 103 <br /> www.floorchem.com Raleigh,NC 27606 <br /> "A NC WBE Company" Phone: 919-854-9776 <br /> May 3, 2016 <br /> RE: Motor Pool —Flooring upgrades <br /> The following is a proposal for installing the flooring in the above facility. Specifications are as follows: <br /> Single Solid Broadcast— 1/16" floor approx. 60 mils thick dry, <br /> 1. Remove existing VCT from floors <br /> 2. Diamond grind floors to remove VCT glue, clean & profile for acceptance of new coatings <br /> 3. Vacuum clean to remove dust and debris <br /> 4. Repair joints and/or cracks with flexible joint filler, membrane as needed <br /> 5. Apply primer coat of high solids epoxy resins lightly broadcasted with aggregates <br /> 6. Apply full broadcast with clear epoxy resins and colored vinyl microchips <br /> 7. Apply grout/seal coat of quick cure urethane <br /> 8. Apply top/seal coat of quick cure urethane for a slip resistant finish <br /> Price quote for above will be $4,902.00 <br /> Areas bathrooms and hallway approx. 1,032 sq.ft.floors <br /> Special Notes Please Read <br /> ► "Pricing effective for all areas to be done at the same time. <br /> ► "Any new concrete slab areas to receive coatings should not be sealed with anything. It should be wet <br /> cured with a light trowel finish. Any sealer on concrete will jeopardize the new coatings, as not all of the <br /> sealer can be removed completely from the concrete. <br /> Conditions <br /> ► Floors must cure for 24 hours before any equipment, furniture and 48 hours for automobile traffic is moved <br /> back on to the floors. This is very important and if not followed, will void warranty. <br /> ► Site will need adequate lighting for floors to be installed. This should be the same lighting when floor is to <br /> be inspected. <br /> ► Adequate power will be needed to operate certain flooring and hand equipment, vacuums etc. <br /> ► If work is performed in cold weather, then slab must be a minimum of 55°F at installation. <br /> ► If removal of existing floor covering, such as carpet, vinyl or ceramic tile, is required, then the owner or GC <br /> is responsible for supplying a dumpster for disposal of such materials. <br /> Warranties <br /> ► Workmanship will be guaranteed for one (1)year after date of completion on all floors. <br /> Terms <br /> ► Payment terms are net 20 please, upon completion of phased work. Service charges will apply to past due <br /> invoices. Excessive delay of payment will void all warranties. <br /> If further information is needed,please do not hesitate to call on me. <br /> Respectfully Submitted, <br /> Anita M. Brack <br /> Owner <br /> d 1a 1yp1wo torpool orangeco <br />