Browse
Search
2016-285-E Planning - Paul L. Wilkerson Jr. Grading Company - sewer easement, grading and repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-285-E Planning - Paul L. Wilkerson Jr. Grading Company - sewer easement, grading and repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 3:50:44 PM
Creation date
6/6/2016 3:39:25 PM
Metadata
Fields
Template:
Contract
Date
5/13/2016
Contract Starting Date
5/13/2016
Contract Ending Date
6/30/2016
Contract Document Type
Contract
Amount
$2,150.00
Document Relationships
R 2016-285-E Planning - Paul L. Wilkerson Jr. Grading Company for sewer easement grading and repair
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:094C147D-86BF-4209-9925-2A2FCCACE30D <br /> EFLAND SEWER OUTFALL REPAIR <br /> Location: Graham Outfall, Graham's Mobile Home Park Driveway, off of US 70 in <br /> Efland <br /> Issue: Water is not staying in ditch as it runs down the road. As it jumps across <br /> the driveway at the bottom of the hill, the water is cutting into the driveway. <br /> Other portions of the drive have settled somewhat and are holding water. <br /> Scope of Work: Contractor will grade the western ditch along the driveway to <br /> standardize the ditch cross section so that it will consistently carry water. Ditch at <br /> curve needs to be able to carry water from an average storm around the corner <br /> rather than water flowing across the road. <br /> At three low spots in the driveway, ABC material will be brought in to raise the <br /> low spots to match the existing grade. <br /> After the ditch has been graded, the Contractor will stabilize the new ditch profile <br /> by seeding and installing a biodegradable roll-type matting to protect the seed <br /> and hold it in place until it is established. <br /> It will be the Contractor's responsibility to call NC811 to have underground <br /> utilities marked. Contractor will pothole or otherwise field locate all underground <br /> utilities and protect these during the project as necessary. <br /> It will be the Contractor's responsibility to coordinate the work with the owner of <br /> the Mobile Home Park and with the individuals living along the road. Access to <br /> driveways must be coordinated ahead of time and under no circumstances shall a <br /> driveway be left inaccessible at the end of a work day. <br /> Contractor will be responsible for any damage to mailboxes, driveway culverts <br /> and other incidental damage which might be caused by Contractor during the <br /> project. <br /> Any soil material that cannot be used on the project will be disposed of on the <br /> Graham property in the location designated by the property owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.