Browse
Search
2016-282-E Solid Waste - Judy D. Brooks Contract Amendment for food waste collection
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-282-E Solid Waste - Judy D. Brooks Contract Amendment for food waste collection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 3:46:58 PM
Creation date
6/6/2016 8:02:48 AM
Metadata
Fields
Template:
Contract
Date
7/1/2016
Contract Starting Date
6/21/2011
Contract Ending Date
6/30/2018
Contract Document Type
Contract Amendment
Amount
$300,000.00
Document Relationships
2011-219 Solid Waste - Judy Brooks for collection of Food Waste
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
R 2016-282-E SW - Judy D. Brooks Contractor - Amendment to Contract for food waste collection
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:20877915-9004-438F-AI77-54177939AE44 <br /> Vill. Each service vehicle must not leak collected organic material and/or fluids,and the exterior <br /> of vehicles should be reasonably clean and represent the County in a professional manner; <br /> ix. Each service vehicle must meet all Federal, State and local regulations and be equipped <br /> with a spill kit to assist In the cleaning of any flu.1d leaks or spills Including diesel fuel, <br /> hydraufla,fluid, oil,etc. <br /> X. Work with the County and generator- to determine the minimum number of service <br /> containers needed for,00llection.' <br /> A. Guarantee that properly separated,food waste and organic waste-materlat will not be <br /> landfilled. <br /> M. GENERAL REQUIREMENTS FOR SELECTED CONTRACTOR <br /> A. Reporting <br /> Beyond those requirements listed in Section 11, Subsection F, Contractor shall submit monthly and annual <br /> reports to the County, The required monthly reports shall be submitted with Invoice for services,and shall <br /> Include: <br /> • Itemization of alf charges to County for materials used (if applicable), cost per ton, and total tonnage; <br /> • Total-weights collected for each collection day for each business; <br /> • Total weights collected from each business In the program for that respective month. <br /> Required annual reports are to.Include summaries of the above information, and-are to be submitted by- <br /> August I h of each year, <br /> B. Insurance Requirements <br /> All Insurance requirements are. included In the County's Service contract which.is Included. The <br /> ,successful contractor shall be•required to enter Into the Service Contract <br /> Evldp,ncG-,of Insurance must be provided with the proposal. <br /> C. Term <br /> The term of the Contract shall be for a five(5)year period beginning upon the date of execution of the Contract <br /> and terminating five 0 years from the effective date provided'lhat; <br /> • funds are authorized annually by the Board of Orange County Commissioners, <br /> • neither County nor the Contractor desire to altorthe terms of-the contract during the five year period,and <br /> • the Contract Is not otherwise terminated through provisions of another clause of the Contract. <br /> At the close of the initial five(5)year Jorim'the contract may be•extended at the option of County and with the <br /> agreement of Contractor to include up to two additional two year renewal periods. <br /> IV. PROPOSAL PROCEDURES <br /> A. Proposed-Timellne <br /> The proposed thellne for the RFP process and program implementation Is as follows: <br /> April 29,2011,—RFP 367-5175 Is Issued <br /> May 6,201.1 at 3:00 PM—Mandatory Pre-Proposal Meeting <br /> May 10,2011 at 3:00 PM—Deadline for written questions <br /> May 17,2011 at 5:00 PM—RFP submissions are due <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.