Browse
Search
2016-280-E DEAPR - Summit Design & Engineering Services - Phase I Env. Site Assessment of property owned by S.L. Efland Heirs, LLC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-280-E DEAPR - Summit Design & Engineering Services - Phase I Env. Site Assessment of property owned by S.L. Efland Heirs, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 3:43:31 PM
Creation date
6/3/2016 11:08:55 AM
Metadata
Fields
Template:
Contract
Date
5/16/2016
Contract Starting Date
5/16/2016
Contract Ending Date
6/30/2016
Contract Document Type
Contract
Amount
$4,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A5lE7lB9-1821-4DOD-A4C4-EB5FA69E6B77 <br /> USU�ltAT 919.732.3883 SI I�11�11T-ENGINEERXOM <br /> DESIGN AND ENGINEERING SERVICES 504 Meadowland Drive, Hillsborough,NC 27278 <br /> 1. A visual site evaluation by an environmental professional. The site reconnaissance is performed to <br /> identify visual signs of the past or current presence of hazardous materials on the subject site or on <br /> adjacent properties. The site reconnaissance also allows potential evidence from the review of the <br /> public records to be evaluated in the field. The site reconnaissance will include the following <br /> activities: <br /> a. A visual reconnaissance of the subject site and a cursory inspection of immediately <br /> adjacent properties to observe signs of the handling of chemicals of concern on the subject <br /> site or on immediately adjacent properties that could impact the subject site. <br /> b. The reconnaissance will include an inspection of surface conditions, including stressed <br /> vegetation, subsidence, or unusual soil discoloration that could indicate the presence of <br /> buried tanks, buried wastes, or prior releases of hazardous materials. <br /> c. Photographs of the subject property, and if appropriate, any immediately adjacent <br /> properties will be taken to document any unusual features such as those noted above. <br /> 2. A review of historical background data, including: <br /> a. Aerial photographs, where available, to help establish past uses of the project site. <br /> b. Ownership information, through a review of historical records or by interviews with long- <br /> time owners. <br /> c. Interviews with past owners/tenants of the project site and owners of the adjoining <br /> properties, whenever possible. <br /> d. Other information sources, which may also be researched, include Sanborn Fire Maps, <br /> USGS quadrangle maps, property tax files, zoning/land use records, building records, local <br /> street directories and phone books. <br /> 3. A review of publicly available and practically reviewable governmental and corporate held <br /> documents (where made available), including the following: <br /> a. Files of regulated and unregulated sites listed with the state and federal Environmental <br /> Protection Agencies,particularly relating to the Resources Conservation and Recovery Act <br /> (RCRA), Comprehensive Environmental Response, Compensation and Liability Act <br /> (CERCLA), State and National Priority Lists,North Carolina Underground Storage Tank <br /> and Groundwater Incidents (Leaking Underground Storage Tanks) Databases, and Solid <br /> Waste Facilities Database with the appropriate State Environmental Agency. <br /> b. Electrical utility corporations having transformers and/or substations on the site. <br /> c. Local fire departments files concerning reports of leaking UST's, remediation projects, and <br /> hazardous material (HAZMAT) spill responses; if appropriate. <br /> d. County or municipal health department's files concerning permits, complaints, violations <br /> and landfills directly related to the project site and adjacent properties. <br /> e. Previous environmental assessment studies, reports, notices of past or current violations of <br /> the environmental regulations and permits in possession of the current owner . <br /> 4. Subsurface information if available, including a review of the following: <br /> a. A literature search of geologic information. <br /> b. A review of site-specific geotechnical soil borings, whenever available. <br /> The Phase I ESA report will include an Executive Summary of the information compiled in the report and <br /> a technical opinion of an environmental professional. The Phase I ESA report will be prepared in <br /> accordance with the requirements of ASTM Standard E1527-13, "Standard Practice for Environmental <br /> Site Assessments: Phase I Environmental Site Assessment Process" and 40 CFR Part 312 - "Standards <br /> and Practices for All Appropriate Inquiries". <br />
The URL can be used to link to this page
Your browser does not support the video tag.