Orange County NC Website
SPOT P4.0 Transportation Project Prioritization Process (STIP 2018 — 2027) — TARPO <br /> 6 <br /> Initial Project List Statewide Regional Impact Division Needs' <br /> 100%Data Driven 70%Data Onven,15%MVO/RVO Input,15%DIDISIon Input 50%Data Dnve%25%MPO/RPO Input,25%Dt,SDD Input <br /> ■ 1 June 2015 . ) April/May 2016 . ) August/September 2016 . , December 2016 <br /> NC 54 Operational Improvements RECEIVED LOCAL INPUT POINTS(35) NC 54 Operational Improvements <br /> Q (Orange Grove Road-originally (Orange Grove Road originally <br /> Dodsons Crossroads-to Old Dodsons Crossroads-to Old <br /> Fayetteville Road) Fayett jIJ oad) <br /> 0 <br /> NC 54 Widening(Orange Grove Road <br /> 4 NC 54 Widening(Orange Grove Road (k Removed from Local Input Scorings <br /> to Old Fayetteville Road) @ to Old Fayetteville Road) <br /> 4111/ <br /> Buckhorn Road(SR 1114)Widening: Included as part of the B-G MPO Project List <br /> 4, Old Greensboro Road Paved = Old Greensboro Road Paved <br /> IMp 0 Shoulders <br /> Shoulders <br /> 0 Efland-Cedar Grove Road Efland-Cedar Grove Road <br /> Improvements:P ,4 Improvements: <br /> 6 Orange Grove Road/Buckhorn Road Am_ <br /> iii Grove Road/Buckhorn Road <br /> Paved Shoulders Paved Shoulders <br /> NC 54 Widening(NC 119 in <br /> 0 <br /> Orange C Grove Road Paved nis Rod) Not Carried Forward Alamance County to Orange Grove Removed from Local Input Scorings <br /> (From NC 54 to Arthur Minnis Road) Road)s <br /> t Dairyland Road Paved Shoulders 11W Not Carried Forward NC 54 and Orange Grove Roa <br /> Intersection Improvements <br /> RECEIVED LOCAL INPUT POINTS(100) <br /> / <br /> Orange Grove Road/Dodsons <br /> *Projects in the Division Needs category are scored as low priorities as they are not eligible for funding at the Regional Impact funding level. <br /> `9 Crossroads 4w Not Carried Forward tThe NC 54 widening projects have been removed from scoring in favor of the operational improvements projects,which scored higher and will <br /> solve the problems along the corridor in the interim.Also,a corridor study on NC 54 is programmed,which will provide better data to <br /> determine the best approach to solving(future)congestion issues on the roadway. <br />