Orange County NC Website
Attachment 1: SPOT P4.0 Transportation Project Prioritization Process (STIP 2018 — 2027) — DCHC MPO <br /> 5 <br /> Initial Project List St6._____ Regional Impact Division Needs* . <br /> 10%%Data DIVen 70%Data often,15%M00/000 Input,15%Division Input 50%Data Dnve%25%MPO/0.00 Input,25%Dt'1mm Input <br /> • i June 2015 : ■ April/May 2016 . ) August/September 2016 . , December 2016 <br /> ® South Churton Street(Old NC 86)from I- South Churton StreetTO d NC 86)from I- <br /> 40 to Eno River Improvements 40 to Eno River Imerovements <br /> 0 1-40 Widening from 140/I 85 interchange 1-40 Widening from 1-40/1-85 <br /> to NC 86 interchange to NC 86 <br /> al-40 Widening from NC 86 to U.S.15-501 " 0 1-40 Widening from NC 86 to U.S.15-501 <br /> 0 1-40 and NC 86 Interchange RECEIVED LOCAL INPUT POINTS(100) <br /> Improvements <br /> 185/Old NC 86(SR 1009 South Churton FUNDED! 1-85/Old NC 86(SR-1009-South <br /> 5 al <br /> Street)Interchange Improvements � Churton Street)Interchange <br /> _ Improvements <br /> 6 I-85/NC 86 Interchange Improvements <br /> RECEIVED LOCAL INPUT POINTS(100) <br /> J NC 86 Improvements North of 86 Improvements Nort o <br /> Hillsborough Hillsborough <br /> Eno Mountain Road/Mayo Street at Eno Mountain Road/Mayo Street at <br /> r '11 11 Oran a Grove Road <br /> Orange Grove Road <br /> 0 U.S.70 East/1-85/1-40 Connector — m Cli U.S.70 East/I-85/I-40 Connector <br /> Homestead Road Bike Lanes and Homestead Road Bike Lanes and <br /> Sidewalks Sidewalks <br /> 141. Eubanks Road Bike Lanes Not Carried Forward Extend Orange Grove Road from Orange <br /> RECEIVED LOCAL INPUT POINTS(35) Grove Road to US 70A <br /> �1�� Mt.Carmel Church Road Bike/Pedestrian Not Carried Forward ® NC 2 -•• eville Road I. — — <br /> Improvements •roveme <br /> �l3' Orange High School Road/Harold Latta Not Carried Forward 1-85 rom Mt.Herman C urc to <br /> Road Sidewalk Improvements Durham Coun Line Widenin: <br /> Orange Grove Road/l-40 Pedestrian 1-85 from 1-85 1-40 Sp it to east o the NC <br /> 6 .. g Bridge ♦.. Not Carried Forward 86 Interchange Widenin: <br /> `1;5 Dairyland Road Paved Shoulders Not Carried Forward Dimmock's Mill Road Rail Crossing <br /> A Improvement and Bellvue Street Closure tThis project crosses DCHC MPO and TARPO <br /> Trail Connection from English Hill Lane to t. NC 54 Operational Improvements(Orange boundaries and is rated as top priority in the TARPO <br /> II Not Carried Forward Grove Road to Old Fayetteville Road) region.It will receive local input points from both <br /> Buttonwood Drive Y ) g P P <br /> ® RECEIVED LOCAL INPUT POINTS (65) organizations. <br /> Trail Connection from Patriot's Pointe to Not Carried Forward <br /> Timbers Drive * *Projects in the Division Needs category are scored as low priorities as they are not eligible for funding at the Regional Impact funding level. <br /> Once the Regional Impact scores are returned from NCDOT in August/September,the projects will be reprioritized. <br />