Orange County NC Website
2 <br /> 1 We understand that the Town of Carrboro is cooperating with Google Fiber [now Alphabet <br /> 2 Corporation] to provide high-speed Internet connections to the Town, and parts of Chapel Hill <br /> 3 and Orange County. Google required that the site for a small building for its hub with its <br /> 4 computers and 120,000 BTU of air conditioners to keep it cool be on Town land. Work has <br /> 5 begun on the chosen site, a small parcel of Town land connected to the Westwood Cemetery <br /> 6 on Fidelity St. A number of trees have been cut down to make room for the building, which <br /> 7 adheres closely enough to the custom-written relevant ordinance—less than 15 feet high and <br /> 8 less than 500 square feet total—that it doesn't require a public hearing. <br /> 9 <br /> 10 While this plan, in the process of being implemented, puts the area on the path to high-speed <br /> 11 connectivity, we think that other sites should be considered before work goes on. We would <br /> 12 like the construction to pause briefly while Google and the Town of Carrboro consider putting <br /> 13 this hub on another site. For instance, the OWASA property is very close by and it offers <br /> 14 greater security: there is a wrought-iron fence around OWASA facilities, three fire hydrants in <br /> 15 close proximity, back-up power, professional noise abatement, and a 24/7 staff of engineers. <br /> 16 The OWASA Board has indicated that its campus might be an appropriate place for the relay <br /> 17 facility—preliminary idea, worth following up. <br /> 18 <br /> 19 If Google takes over the site next to the cemetery, that locks up one of the last open spaces in <br /> 20 Carrboro and puts noisy machines next to the meadow adjoining the cemetery. We think that <br /> 21 may be a prime site for a municipal park and would hate to see that potential lost. This <br /> 22 meadow is one of the few potential parks south of Main Street. Rushing construction without <br /> 23 the usual public hearings would perhaps give Google an edge over its competitors, but would <br /> 24 definitely have a negative impact on the town's environment. <br /> 25 <br /> 26 Judith Ferster for the Executive Committee, Orange/Chatham Sierra Club Group <br /> 27 919-929-6648 jferster @ncsu.edu <br /> 28 <br /> 29 Bob Proctor read the following comments: <br /> 30 <br /> 31 Carrboro's siting of Google's facility on Carrboro cemetery land, which is on Carrboro's <br /> 32 densest block, was rushed and artificially constrained by Google for business reasons. <br /> 33 This led to an opaque process and then to a lousy siting decision, from the perspective of <br /> 34 the county. <br /> 35 <br /> 36 I am not here to raise nimby issues or to complain about the Town's faulty processes. Those <br /> 37 are tiny matters when compared to three major issues: When I covered these three last week <br /> 38 before OWASA, it seemed that their board members agreed on each of them. Google insists <br /> 39 on speeding siting to dominate its chosen markets ... some areas can't feasibly be wired twice <br /> 40 ... Google wants to get the jump on AT&T. <br /> 41 <br /> 42 The first major county issue is that the OWASA site is far more secure. We are becoming more <br /> 43 dependent upon the internet ... say for health monitoring. Our proposed OWASA alternative <br /> 44 site is in the center of OWASA's 24/7 manned campus, next to their employee's parking, inside <br /> 45 fences. There are three fire hydrants there. <br /> 46 <br /> 47 Secondly, putting Google on the cemetery land will spoil future flexibility for transitioning that <br /> 48 space to a park: Due to a ridge, it would be easy to screen off the meadow for quiet activities <br /> 49 away from the graves. The construction underway is exactly where you'd want to put a parking <br /> 50 lot for an urban park; otherwise the large stately pines on the grass would have to go. <br />