Browse
Search
Agenda - 06-26-2007-4s
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4s
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:35:46 PM
Creation date
8/28/2008 11:11:25 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4s
Document Relationships
2008-042 Planning - Clarion Associates Consultant Services Comprehensive Plan Update
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />Task 2: Advisory Board Meetings <br />Contractor: <br />A. JOINT ADVISORY BOARD MEETING <br />• Participate in Joint Advisory Board meeting (October 2007) to "kick-off' the <br />beginning of Phase II activities. (1 meeting) <br />• Coordinate with the Dispute Settlement Center (consultant hired to facilitate <br />some meetings) and Project Management Team to prepare for meeting and <br />collect meeting notes/documentation following the Joint Advisory Board <br />Meeting. (2 meetings) <br />B. ELEMENT LEAD ADVISORY BOARD MEETINGS (Maximum of 7-meetings) <br />• Meet once with each Lead Advisory Board to present a detailed draft Table of <br />Contents for that Board's individual Element. <br />• As a partner with Element Managers, convey gaps and recommendations for <br />filling them. <br />• Prepare a memorandum summarizing the feedback provided by each <br />Advisory Board. <br />• Revise draft Table of Contents for the Comprehensive Plan as directed by <br />Element Managers, taking Advisory Board feedback into consideration. <br />• Convey Advisory Board preference for filling gaps to Project Management <br />Team. <br />C. PLANNING BOARD MEETINGS (Maximum of 3-meetings) <br />• Appear with staff to provide updates to the Board on the progress of the <br />overall project and the Elements in which the Planning Board does not play a <br />lead role. <br />County Staff: . <br />• All arrangements and meeting materials for Joint Advisory Board Meeting. <br />• Coordination between Dispute Settlement Center and Contractor. <br />• Coordination of Lead Advisory Board Meetings. <br />Deliverables: <br />• Documented feedback from Advisory Boards <br />• Final draft, detailed, Tables of Contents for 7 Elements. <br />Schedule: Completed in October and November 2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.