Browse
Search
Agenda - 06-26-2007-4s
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-26-2007
>
Agenda - 06-26-2007-4s
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:35:46 PM
Creation date
8/28/2008 11:11:25 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Document Type
Agenda
Agenda Item
4s
Document Relationships
2008-042 Planning - Clarion Associates Consultant Services Comprehensive Plan Update
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20070626
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />Task 3: Formatting/Assembling Comprehensive Plan <br />Contractor: <br />SYNTHESIZE DOCUMENTS <br />Coordinate with Element Managers to collect any material prepared by county <br />staff to fill identified gaps, as directed by the Project Management Team. <br />Following standardized formatting guidelines (to be developed by Element <br />Managers and approved by the Project Management Team) and the Table of <br />Contents that were completed for each Element, synthesize documents into a <br />.draft Comprehensive Plan. <br />Adopted County Profile Element shall be inserted into the draft. <br />County Staff: <br />• Complete and convey any material required to fill gaps as instructed by the <br />Project Management Team. <br />• Provide formatting guidelines. <br />• Provide, in agreed upon format, Sections I-V of the Comprehensive Plan, as <br />described in Attachment 1. <br />Deliverables: <br />• 120 black-and-white copies of Draft Comprehensive Plan based on detailed <br />Tables of Contents developed for each Element and general Table of <br />Contents (i.e. Intro., Planning Principles, Admin., and Monitoring) for overall <br />Comprehensive Plan (Attachment 1). An electronic copy shall also be <br />provided on CD. <br />Schedule: Completed by end of February 2008. <br />
The URL can be used to link to this page
Your browser does not support the video tag.