Orange County NC Website
19 <br />demolition/pre-construction conference with the County's Solid Waste staff. This may <br />be the same meeting held with other development officials. <br />48. Heavy Duty Pavement: That the applicant shall provide heavy-duty pavement for service <br />vehicles across drive aisles access routes to refuse container(s), subject to Tawn Manager <br />approval. <br />49. Recycling Specialist: That the applicant shall meet with an Orange County Recycling <br />Specialist near the time of occupancy of the development. <br />SO.Overhead Obstruction/Utility Lines: That the final plans shall include details verifying <br />that no overhead obstruction or utility wires will interfere with service vehicle access or <br />operation. <br />S 1. Utility tin Pg lan Approval: That the final ~Utility/Lighting Plan shall be approved by <br />Duke Energy Company, Orange Water and Sewer Authority, BellSouth, Public Service <br />Company, Time Warner Cable, and the Town. Manager prior to .issuance of a Zoning <br />Compliance Permit. ~ ~, <br />S2. Utility Line Placement: That except for three phase electrical distribution line, all new <br />and relocated utility lines shall be placed underground. The applicant shall indicate <br />proposed off-site utility line routing and upgrades required to service the site on Final <br />Plans, to be approved by the Town Manager~prior to issuance of a Zoning Compliance <br />Permit. <br />S3. Street Liahtin~ Plan: That a street lighting plan shall be reviewed and approved by Duke <br />Energy and the Town Manager prior to the issuance of a Zoning Compliance Permit. <br />That if the proposed street lighting plan includes non-standard poles and/or fixtures that <br />the plans and the Homeowners' Assaciation documents indicate that the applicant or <br />Homeowners' Association shall be responsible for the additional cost as determined by <br />Duke Energy. <br />54.OWASA Easements: That easement documents as required by OWASA and the Town <br />Manager be recorded before final plat approval. <br />55. Fire Hydrant Location: It is required that all new structures be located within 400 feet of a <br />fire hydrant and that all hydrants be shown on Final Plans, subject to the approval of the <br />Town Manager. <br />S6. Fire Apparatus Access: All driveway entrances shall be designed to meet the minimum <br />unobstructed turning radii for fire apparatus access. <br />57. Fire Flow Report: That a fire flow report for all new development, shall be prepared and <br />sealed by a registered professional engineer, which demonstrates that flows meet the <br />minimum requirements of the Town Design Manual, to be approved by the Town <br />Manager prior to issuance of a Zoning Compliance Permit. <br />