lines;and GRANTEE shall have the right,privilege and easement to tap the line or lines and
<br /> construct,maintain, inspect,operate,and repair sewer laterals from the main to the outside
<br /> boundary of the 11,826 square feet,more or less,over which this easement and privilege
<br /> extends;and GRANTEE shall have the privilege,easement,and right to clear and keep cleared
<br /> the full width of the easement of and from brush,plants,trees,and any and all other materials,
<br /> obstructions, structures,and encroachments of any kind;the owners of the fee shall retain the
<br /> right to cultivate the ground lying within the boundaries of the easement,provided that such
<br /> cultivation shall not interfere with the right of the GRANTEE herein named of ingress,egress,
<br /> and regress to said easement for the purpose of operation,maintenance,repair, or replacement of
<br /> said sewer mains, lines,laterals,connections,and manholes; GRANTEE shall also have the right
<br /> at such times as may be convenient to its purposes of ingress,egress,and regress to and from the
<br /> said easement over GRANTOR's land adjacent to the said easement to any adjoining lands or
<br /> public rights of way;and provided further that in all cases where there are roads or streets across
<br /> the tract of land sufficient for the purpose of convenient egress, ingress, and regress in,to,and
<br /> from said strip of land, such roads or streets shall be used by the said GRANTEE when it is
<br /> necessary to come in and upon said strip of land for the purposes aforesaid.
<br /> AND,GRANTEE,by and through its employees,agents, contractors, successors and
<br /> assigns may enter GRANTOR'S said property, and thereupon may install any such temporary
<br /> facilities as may be necessary to construct,maintain,repair,or continue operation of
<br /> GRANTEE'S sewer collection system,within the temporary easements of 3,960 and 1,138
<br /> square feet,more or less; GRANTEE will not remove trees within the temporary easement for the
<br /> purpose of construction of these facilities unless the parties otherwise agree.However,
<br /> GRANTEE may excavate the area within the easement as necessary to install the temporary
<br /> facilities.Upon completion of the construction project involving replacement of the sewage
<br /> system,GRANTEE will remove the temporary facilities.
<br /> It is understood and agreed by the parties that this easement is an exclusive easement and
<br /> the area within the easement may not be used by third parties without GRANTEE'S express
<br /> written consent. Said perpetual easement is to be freely and fully transferable by the GRANTEE
<br /> to its heirs, successors, assigns, agents and/or contractors without prior notice, written or
<br /> otherwise,to the GRANTOR.
<br /> No building or structure of any kind,nor any other utility or improvement,except such as
<br /> may be constructed or consented to by GRANTEE,shall be located or erected upon or within the
<br /> above described easement.
<br />
|