Orange County NC Website
Appendix E Page 18 of 32 <br />to the Contract Between Orange County and The Resolute Building Company for <br />Central Orange Senior Denier Addition & SportsPlex Renovation <br />IA7-3300 <br />Value Engineering Deductions <br />Please deduct the following from our TOTAL: <br />1. Controls VE deduct $70,OOOoo <br />2. Equipment VE deduct $25,OOOoo <br />3. Duct System VE deduct $40,OOOoo <br />Drawing Revisions <br />Please add the following to our TOTAL: <br />1. Fire Dampers per revision 2 add $2,780.00 <br />EXCLUSIONS <br />The following items are excluded from our estimate: <br />1. Roofing, walUfloor cutting and patching <br />2. Duct-type smoke detectors provided by others, installed by Lee AC <br />3. Temporary heating/cooling or filters <br />4. Repair or maintenance for existing equipment <br />5. Trash disposal bins <br />6. Filter changes for existing operational equipment <br />Sincerely, <br />Raynor Smith, P.E. <br />V.P. of Commercial Operations <br />smitiu(a~leeac.com <br />