Browse
Search
Agenda - 09-19-2007-6a2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6a2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:18:04 AM
Creation date
8/28/2008 11:10:21 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6a2
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E Page 17 of 32 <br />to the Contract Between OranOe County and The Resolute Building Company for <br />Central Orange Senior Center Addition & SportsP{ex Renovation <br />IA7-3300 <br />Lee Air Conclitioners, Inc. <br />P.O. Box 2895, Durham NC 27715 <br />5109 Neal Road, Durham NC 27705 <br />Ph:914-383-1588 ~ Fax:919-383-0448 <br />www.leeac.com <br />Proposal <br />August 16, 2007 <br />Resolute Building Company <br />PO Box 3656 <br />Chapel .Hill, NC 27515 <br />Ref: Central Orange Senior Center Addition and Sportsplex Renovation <br />REVISED far VE <br />Attn: 1VSr. Anthony Wood <br />As requested, we have prepared an estimate based on plans dated 3/12/2007 and specifications for the <br />above referenced project: <br />BASE BID <br />We propose to provide the following: <br />1. RTU's 2 through 7,11, 12 <br />2. Two (2) infrared heaters <br />3. Five {5) ceiling fans and four {4) roof fans <br />4. Five {S) baseboard heaters <br />S. DDC controls for base bid equipment <br />6. Remove CU-4 and AHLT-4 to be stored on site until relocation to mezzanine <br />7. Demolition to include cutting duct loose to be dropped and removed by others <br />8. Provide load-side electrical wiring and disconnects <br />9. Install smoke detectors {provided by EC) <br />10. Install temporary, exhaust fan for mezzanine ventilation (wiring by EC) <br />11. Pem~it Fees <br />12.One-year general warranty and five-year compressor warranty <br />13. Professionally engineered design drawings <br />TOTAL ........................................................5463,500.00 <br />Alternate b .................................................... $30,900.00 <br />Provide and install new RTU8 in place of old RTU-4 <br />Alternate 7 .................................................... $14,b00.00 <br />Provide and install new RTU-1 in place ofRTU-2 and 3 with duct modifications <br />Alternate 8.......... ..................................... $37,100.00 <br />Remove old RTU and install new RTU-10 to serve Locker Area <br />
The URL can be used to link to this page
Your browser does not support the video tag.