Browse
Search
Agenda - 09-19-2007-6a1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-6a1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:18:40 AM
Creation date
8/28/2008 11:10:00 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
6a1
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY AGREEMENT FOR CONSTRUCTION <br />NORTH CAROLINA MANAGER AT RISK SERVICES <br />This AGREEMENT is made and effective on this date: <br />BETWEEN The Owner: <br />ORANGE COUNTY, NORTH CAROLINA (hereinafter referred to as "Owner" or "the Owner") <br />And the Construction Manager At Risk (hereinafter referred to as "CMAR" or "the CMAR"): <br />RESOLUTE BUILDING COMPANY, INC. <br />For services in connection with the Project known as: <br />The CENTRAL ORANGE SENIOR CENTER & SPORTSPLEX RENOVATION, Hillsborough, North <br />Carolina, as further described in Article 2 <br />For which the Designer is: <br />CORLEY, REDFOOT, ZACKARCHITECTS & ENGINEERS, ATTN: KEN REDFOOT, 222 CLOISTER <br />COURT, CHAPEL HILL, NC 27514 <br />The Owner and CMAR, in consideration of their mutual covenants herein, agree as set forth below: <br />TABLE OF CONTENTS <br />ARTICLE 1 - RELATIONSHIP OF THE PARTIES ......................................................................................... 4 <br />1.1 Owner and Construction Manager At Risk <br />1.2 Owner and Desioner <br />1.3 CMAR and Contractors <br />1.4 Relationshi~of the CMAR to the Designer <br />ARTICLE 2 -PROJECT DEFINITION .......................................................................................................... 4 <br />ARTICLE 3-CONSTRUCTION MANAGER AT RISK'S SERVICES ................................................................... 4 <br />3.1 CMAR Services <br />3.2 CMAR Personnel <br />3.3 Construction Management Plan <br />3.4 Consultant Selection <br />3.5 Time Management <br />3.6 Cost Manaaement <br />3.7 Management Information System jMISI <br />3.8 Design Phase Services <br />3.9 Procurement Phase <br />3.10 Construction Phase <br />3.11 Post Construction Phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.