Browse
Search
Agenda - 09-19-2007-4j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-19-2007
>
Agenda - 09-19-2007-4j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 4:19:04 AM
Creation date
8/28/2008 11:09:42 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2007
Document Type
Agenda
Agenda Item
4j
Document Relationships
Minutes - 20070919
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-068 Congestion Mitigation & Air Quality (CMAQ) Grant Agreement with the NCDOT
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />must be approved by the Board of Transportation. Bids received, depicting DBE Goals along <br />with the recommendation of the qualified low bidder, shall be submitted to the Department's <br />Transportation Planning Branch for approval prior to the contract being awarded by the County. <br />The Department will review all bids and the County's recommendation of the qualified low <br />bidder, and the Board of Transportation may approve or reject the County's recommendation. <br />After approval of a qualified low bidder by the Board of Transportation, the County may award <br />the contract. Further, upon award of the project to contract, the County will furnish to the <br />Department two (2) sets of plans with one (1) final contract. All work shall be performed in <br />accordance with Departmental standards and specifications and the plans must be prepared in <br />Microstation format using Geopak software. Letting of contracts for construction and purchases <br />shall be in accordance with Federal Aid Policy Guide, 23 CFR Part 635 and the North Carolina <br />General Statute 143-129. <br />15. The County shall construct, or cause to be constructed, the project in <br />accordance with the plans and specifications of the project as filed with, and approved by, the <br />Department and in accordance with Federal policies and procedures. The County shall enter <br />into and shall administer.the construction contract for said project and the procedures set out <br />herein below shall be followed: <br />(A) The County, and/or its agent, shall cause to be performed, or will <br />perform, all work required with its own forces. <br />(B) The County shall perform or cause to be performed the necessary <br />construction engineering, sampling and testing, and supervision required during construction of <br />the Project. <br />(C) The County shall be responsible for all sampling and testing required; <br />however, upon written request from the County, the Department will consider pre-testing items <br />that are included in the Department's established statewide program. <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.