Orange County NC Website
6 5/2/2016 <br /> Federal Project Implementation <br /> Process <br /> WE <br /> ARE <br /> HERE <br /> FTA Project <br /> North-South Development/ Engineering Construction <br /> Corridor Study Environmental <br /> Review <br /> Indicates required <br /> FTA approval <br /> CIt el Hill <br /> transit <br /> LOCALLY <br /> PREFERRED <br /> ALTERNATIVE SPRIN 2016 <br /> LPA) 2016 Study Process <br /> FINAL <br /> EVALUATION <br /> WINTER/ <br /> Z SPRING <br /> 2015/ <br /> 2016 <br /> DETAILED <br /> EVALUATION SPRING/ <br /> UJ WINTER PAN...,,.•.„ <br /> 2015 <br /> • WINTER <br /> 2015 W° <br /> CONCEPTUAL <br /> -J 3RD RLIOU D EETING <br /> SCREENING O SUMMER/ y <br /> FALL <br /> > 2014 <br /> Z <br /> 2ND ROUND �`w•`•,�,,,,,•'°p°°„,,"r°°a <br /> ALTERNATIVES <br /> DEVELOPMENT SPRING <br /> 2014 <br /> Col 1ST ROUND co.e wro.� <br /> watic <br /> pr sdpe�se. <br /> - �[tpGS Cwmw•M1 vqN <br /> ASSESS EXISTING CONDITIONS J <br /> AND DEFINE PROJECT CO <br /> PURPOSE AND NEED. <br /> I Ransil <br /> 3 <br />