Browse
Search
Agenda - 05-17-2016 - 8-a - North-South Corridor Study Update – Locally Preferred Alternative (LPA)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 05-17-2016 - Regular Mtg.
>
Agenda - 05-17-2016 - 8-a - North-South Corridor Study Update – Locally Preferred Alternative (LPA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 3:56:20 PM
Creation date
5/12/2016 3:13:01 PM
Metadata
Fields
Template:
BOCC
Date
5/17/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 05-17-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ., <br /> The Recommended Locally Preferred Alternative I April 2016 125/2/2016 <br /> , <br /> -----,---, <br /> A.......11rAr it=I <br /> r - .... -- ........ --- <br /> .. <br /> ■ A <br /> me Dory b. v....7.... .../..0.1..0 <br /> Dedicated Curb Lane-Construct a New Lane ...1.1.16 W.Panale• Mew Parlaide <br /> Mambo/ <br /> N.M. 11.1.11.1 illedell. <br /> -.......17.••■•-. .' • OW. CY Estm .... <br /> ........ <br /> i2••-..^.-"." 11,........... 110-'-'"•"" ...... <br /> , .....,,,... • Mama./E. <br /> ,• gr./ <br /> Idama nom Color OW <br /> Ds <br /> Dedicated Center Lane-Construct a New Lane <br /> MC It■ NC MI <br /> NC•V <br /> . •• <br /> -or <br /> "mg PI" E <br /> ,--' <br /> _ ......,_ ■-::.- - 1,- -' <br /> ...own 1/4.0 NR IMMIwge.11.01. 11....•Map.. <br /> Dedicated Curb Lane-Convert Lane from Existing Use <br /> --- era <br /> LPA Summary <br /> 6-1 6-2 6-3 <br /> Capital Cost $96.8 M $105.9 M $ 105.4 M <br /> Federal $77.4 M $84.7M $84.3 M <br /> Non-Federal $19.4 M $21.2M $21.1 M <br /> O&M Cost $3.4 M <br /> Travel Time 33:10 <br /> _._ <br /> Travel Times Savings 03:51 <br /> Draft Ridership-subject to change 8,575 <br /> Average Peak-Hour Traffic Delay 02:28 00:23 00:49 <br /> 5:00 am-11:00 pm during the week <br /> Hours of operation <br /> 8:00 am-11:00 pm on the weekend <br /> - <br /> Days of operation 7 days a week <br /> Every 7.5 minutes during the day <br /> Frequency of service <br /> Every 10-20 minutes early morning and at night <br /> e 1 ?Alt <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.