Browse
Search
Agenda - 09-06-2007-6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 09-06-2007
>
Agenda - 09-06-2007-6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:03:23 PM
Creation date
8/28/2008 11:07:58 AM
Metadata
Fields
Template:
BOCC
Date
9/6/2007
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20070906
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
S EDC - Participation in the Triangle Area Water Supply Monitoring Project Phase 6
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
S Manager - Interlocal Agreement participation in the Triangle Area Water Supply Monitoring Project Phase 6
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRIANGLE AREA WATER SUPPLY MONITORING PROJECT <br />1NTERLOCAL AGREEMENT <br />ATTACHMENT B <br />TAWSMP ANNUAL COST SHARES FOR PHASE VI: <br />FY 2008 - FY 2012 <br />The annual cost for Phase VI of the Triangle Area Water Supply Monitoring Project is $721,500. <br />The US Geological Survey will provide a forty-five percent cost share match of $324,675. The <br />Monitoring Project Partners' total annual cost for Phase VI is the remaining $396,825, plus <br />$20,000 for TJCOG services and support, plus $10,000 to rebuild a contingency balance. The <br />Monitoring Project Partners' individual annual cost shares are the sum of a base rate and a <br />variable rate. The base rate is thirty percent of the total annual Monitoring Project Partners' cost, <br />which is thirty percent of $426,825, divided equally among the Monitoring Project Partners. The <br />variable rate is seventy percent of the total annual Monitoring Project Partners' cost, which is <br />seventy percent of $426,825, multiplied by each Monitoring Project Partners' percentage of the <br />total average annual water use during Fiscal Year 2006 for all Monitoring Project Partners. <br />Project Partners <br />Cary (includes Morrisville) <br />Chatham County <br />Durham <br />Hillsborough <br />Orange County 2 <br />Orange Water and Sewer Authority <br />Raleigh <br />South Granville WASA <br />Wake County <br />Total <br />Average Annual Share of Total Variable Rate Base Rate Phase VI Annuall <br />Daily Water Use Water Use Cost Share Cost Share Cost Share <br />(mgd) <br />3.24 2.8% $8,446 $11,641 $20,087 <br />14.15 12.3% $36,887 $23,281 $60,168 <br />1.49 1.3% $3,884 $11,641 $15,525 <br />29.44 25.7% $76,753 $11,641 $88,394 <br />1.278 1.1% $3,332 $11,641 $14,972 <br />0.12 0.1% $323 $11,641 $11,964 <br />8.69 7.6% $22,653 $11,641 $34,294 <br />53.23 46.4% $138,762 $11,641 $150,403 <br />2.388 2.1% $6,225 $11,641 $17,866 <br />0.58 0.5% $1,512 $11,641 $13,153 <br /> <br />114.61 100% $ 298,778 $ 128,048 $426,825 <br /> <br />Notes: <br />1. Based on raw water withdrawals during the FY 2005-2006 year as reported by the Partners. <br />2. Orange County's Average Annual Daily Water Use is based on the percentage of the Orange-Alamance <br />Water System service area located within Orange County, as indicated in their 1997 Local Water Supply <br />Plan. <br />Page 16 of 18
The URL can be used to link to this page
Your browser does not support the video tag.