Browse
Search
Agenda - 05-17-2016 - 5-f - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2016 Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 05-17-2016 - Regular Mtg.
>
Agenda - 05-17-2016 - 5-f - Schools Adequate Public Facilities Ordinance – Approval and Certification of 2016 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 4:24:57 PM
Creation date
5/12/2016 3:03:17 PM
Metadata
Fields
Template:
BOCC
Date
5/17/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes 05-17-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> High School Level <br /> A. Does not currently exceed the 110% LOS standard (current LOS is 95.5%). <br /> B. The projected growth rate at this level is expected to increase over the next 10 years <br /> (average—0.93% compared to 0.79% over the past 10 years). <br /> C. Similar to last year,projections are not showing a need to expand Carrboro High <br /> School from the initial capacity of 800 students to the ultimate capacity of 1,200 <br /> students in the 10 year projection period. <br /> ORANGE COUNTY SCHOOL DISTRICT <br /> Elementary School Level <br /> A. Does not currently exceed 105% LOS standard (current LOS is 89.8%). <br /> B. The projected growth rate at this level is expected remain the same over the next 10 years <br /> (average—0.80% compared to 0.80% over the past 10 years). <br /> C. Similar to last year,projections are not showing a need for an additional Elementary <br /> School in the 10 year projection period. <br /> Middle School Level <br /> A. Does not currently exceed 107% LOS standard (current LOS is 80.3%). <br /> B. The projected growth rate at this level is expected to decrease, but remain positive over <br /> the next 10 years (average—0.67% compared to 1.04% over the past 10 years). <br /> C. Similar to last year,projections are not showing a need for an additional Middle School <br /> in the 10 year projection period. <br /> High School Level <br /> A. Does not currently exceed 110% LOS standard(current LOS is 101.2%). <br /> B. The projected growth rate at this level is expected to decrease, but remain positive over <br /> the next 10 years (average—0.56% compared to 1.99% over the past 10 years). <br /> C. Projections are not showing a need to expand Cedar Ridge High School from the initial <br /> capacity of 1,000 students to 1,500 students in the ten year projection period. Last year's <br /> projections showed a need in 2022-23. <br /> ADDITIONAL INFORMATION <br /> The Schools Adequate Public Facilities Ordinance (SAPFO) student projections illustrate when <br /> the adopted level of service capacities are forecasted to be met and/or exceeded in anticipation of <br /> CIP planning and the construction of a new school. However, as is being identified by both <br /> school districts, a new trend is emerging to renovate and expand existing facilities to address <br /> school capacity needs in a more feasible way. As this trend continues, additional capacity <br /> resulting from school renovations and expansions will be added to the projection models in <br /> stages, once funding is approved, versus the addition of greater capacity when a new school is <br /> constructed and completed. The renovation and expansion to existing facilities may delay <br /> construction of new schools further into the future. This process will pose some challenges to <br /> SAPFO compared to the existing process which indicates in advance when a completely new <br /> school is needed. Decisions on the timing of reconstruction funding would be indirectly linked to <br /> the SAPFO model. <br /> iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.