Orange County NC Website
44 <br /> Name of Bidder <br /> Contract/Invitation/Request Number: <br /> Date Last Updated:April,2014 <br /> POST-DELIVERY COMPLIANCE CERTIFICATIONS <br /> (In compliance with the federal requirements of 49 U.S.C. section 5323(m)) <br /> POST-DELIVERY BUY AMERICA COMPLIANCE CERTIFICATION <br /> As required by 49 CFR 663(c), the (the recipient) certifies that it is <br /> satisfied that the buses received, (description of buses) from <br /> (the manufacturer), meet the requirements of Section165(b)(3) <br /> of the Surface Transportation Assistance Act of 1982, as amended. The <br /> (the recipient) has reviewed the documentation provided by the manufacturer, which lists (1) <br /> the actual component and subcomponent parts of the buses identified by manufacturer, country <br /> of origin, and cost; and (2) the actual location of the final assembly point for the buses, including <br /> a description of the activities that took place at the final assembly point and the cost of final <br /> assembly. <br /> POST-DELIVERY FMVSS COMPLIANCE CERTIFICATION <br /> As required by 49 CFR 663(d), the (the recipient)certifies that it received, <br /> at the post-delivery stage, a copy of (the manufacturer's) self-certification <br /> information stating that the buses, (description of buses), comply with the <br /> relevant Federal Motor Vehicle Safety Standards issued by the National Highway Traffic Safety <br /> Administration in 49 CFR571. <br /> Name of Committee/Recipient (Signature of Representative) <br /> (Date of Signature) (Type or Print Name&Title of Representative) <br /> 20 <br />