Orange County NC Website
25 <br /> Independent Cost Estimate <br /> Contract Type: Date of Estimate: <br /> Description of Goods/Service: <br /> Method of Obtaining the Estimate: <br /> I have obtained the following estimate from.... <br /> O Published Price List/ Past pricing (date) <br /> O Engineering or technical estimate <br /> O Independent Third Party estimate <br /> O Other (specify) <br /> Cost Estimate Details: <br /> Through the method stated above it has been determined that the total cost of the <br /> goods/services is expected to be: $ . Details are shown below. <br /> Cost of Standard Items <br /> Cost($/ea) Cost($/ea) Notes/Data <br /> Product Delivered No Freight Source <br /> A <br /> Cost of Services,Repairs,or Non-Standard <br /> Items <br /> Item/Task: <br /> Other <br /> Direct Labor Labor Allocated SG&A Profit <br /> Materials Costs (rate,hours) Class overhead Total <br /> B <br /> Signature of Preparer: <br /> The preceding cost estimate was obtained or prepared by: <br /> [For complex items or tasks, attach detailed spreadsheet(s) explaining rationale.] <br />