Browse
Search
Agenda - 05-17-2016 - 5-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 05-17-2016 - Regular Mtg.
>
Agenda - 05-17-2016 - 5-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 2:54:57 PM
Creation date
5/12/2016 2:54:15 PM
Metadata
Fields
Template:
BOCC
Date
5/17/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes 05-17-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> 1 • provides Phoenix Academy High students with appropriate and supportive facilities, <br /> 2 including a biomedical lab <br /> 3 • provides desperately needed additional space for students with mental health needs and <br /> 4 for students who need a smaller educational environment <br /> 5 • provides a community meeting space and a Black/education history museum <br /> 6 • provides renovations and NC to the existing gymnasium <br /> 7 • addresses moisture and mold concerns <br /> 8 • addresses handicap accessibility issues <br /> 9 • frees up future capital funding to address other school capital needs <br /> 10 • provides appropriately-sized administrative space on the second floor, reducing total <br /> 11 expenditures to a small fraction of the total anticipated CHCCS bond funding allocation <br /> 12 <br /> 13 Next Phase Projects <br /> 14 Phase II, to begin in 3-4 years: Improvements at Ephesus, Estes Hills and Seawell <br /> 15 Elementary Schools and Phillips Middle School. These improvements provide the second most <br /> 16 positive impact to capacity. These improvements will hopefully be funded by long range funds <br /> 17 Orange County has planned for the district's new schools. <br /> 18 Phase III, to begin in 4-7 years: Improvements at Carrboro and Frank Porter Graham <br /> 19 Elementary Schools and at Culbreth Middle School. These projects are currently unfunded. It is <br /> 20 hoped that future-funding sources will be identified to complete all the projects. <br /> 21 <br /> 22 James Barrett thanked the Board for its willingness to discuss these topics. He <br /> 23 expressed his excitement for both the Chapel Hill High School (CHHS) and the Lincoln Center <br /> 24 (LC) projects. <br /> 25 James Barrett said Tom Forcella had talked with alumni from Lincoln High and the <br /> 26 opportunity to bring education back to this area provides great excitement to the alumni <br /> 27 community. <br /> 28 Todd LoFrese said it is important to remember that CHCCS has been operating at <br /> 29 capacity for the last two decades. He said SAPFO projections show a current lull, and thus this <br /> 30 is an opportunity to address the older schools and capacity issues. He said the proposed plan <br /> 31 would create the capacity of one whole elementary school and 200 high school seats by <br /> 32 renovating current buildings. <br /> 33 Todd LoFrese said Chapel Hill High is in need of major renovations. <br /> 34 Todd LoFrese said a packet was provided to the Board ahead of time with CHCCS <br /> 35 projects and priorities included. He said CHCCS also provided written responses to Board <br /> 36 questions which are at their places. <br /> 37 Commissioner Burroughs asked if there are reasons for renovating CHHS, as opposed <br /> 38 to building a new school. <br /> 39 Todd Lofrese said the cost is one issue, and the other is where would students go <br /> 40 during renovations. <br /> 41 Todd LoFrese said there are no additional school sites large enough for a high school. <br /> 42 He said CHHS has 1,500 students, and to phase these students in would be a challenge. <br /> 43 Todd LoFrese said the academic wing is the focus, as it is deemed beyond renovation <br /> 44 and must be a re-build. He said the gym was renovated a few years ago, so it and the <br /> 45 auditorium are salvageable to bring up to Orange County standards. <br /> 46 Commissioner Burroughs repeated her question and clarified that the largest portion of <br /> 47 CHHS will be built new, while the other sections are renovated. <br /> 48 Todd LoFrese said it is $50-70 per square foot to renovate versus $200 per square foot <br /> 49 for a new facility. He said a new high school would be too expensive, and if an entirely new <br /> 50 facility were built at CHHS, there would be no funds to do the projects at the other schools. <br />
The URL can be used to link to this page
Your browser does not support the video tag.