Browse
Search
Minutes 04-07-2016
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2016
>
Minutes 04-07-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 8:16:46 AM
Creation date
5/6/2016 8:06:50 AM
Metadata
Fields
Template:
BOCC
Date
4/7/2016
Meeting Type
Budget Sessions
Document Type
Minutes
Document Relationships
Agenda - 04-07-2016 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 04-07-2016 - Budget Work Session
Agenda - 04-07-2016 - 1 - BOCC Retreat Follow-up on the Established Goals and Priorities
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 04-07-2016 - Budget Work Session
Agenda - 04-07-2016 - 2 - Discussion of Manager's Recommended FY 2016-21 Capital Investment Plan CIP
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 04-07-2016 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> Commissioner Burroughs applauded staff's efforts in maintaining open communication <br /> with Carrboro given past miscommunications. <br /> Commissioner Rich asked if there is a plan for communicating updates with the general <br /> public. <br /> Bonnie Hammersley said the Friends of the Carrboro Library are updated through the <br /> librarian and herself and there are also public meetings. She said she can discuss this further <br /> with the Carrboro Manager. <br /> Travis Myren resumed the presentation: <br /> Continuation Funding <br /> • Detention Facility - $500,000: Page 37 <br /> o Continuation of design services for FY2016-17 <br /> o Total facility estimate of $20,591,331 in FY2017-18 including construction <br /> administration, equipment and furnishings <br /> o Cost estimate based on 144 bed facility with expansion capabilities to 250 <br /> beds if necessary <br /> o Timing assumes modification of the land lease with the State <br /> o Consultant to conduct staffing analysis to recommend most efficient use of <br /> staff resources and project operating cost. <br /> Chair McKee asked if the figures include the potential relocation of the Sheriff's office. <br /> Travis Myren said currently only the detention facility is authorized but options can be <br /> brought back to the Board. <br /> Chair McKee said the sooner this discussion can happen, the better. He asked if the <br /> lease will need to be adjusted, based on changes made by the legislature. <br /> Jeff Thompson said yes. <br /> Commissioner Jacobs asked if there is place in the timeline to discuss the usage of the <br /> old jail. <br /> Travis Myren said that is not included in the CIP. <br /> Jeff Thompson said after the legislature issue, a discussion will need to occur with all <br /> stakeholders. He said this will be plugged into the schedule going forward. <br /> Travis Myren resumed the presentation: <br /> Continuation Funding <br /> • Historic Rogers Road Sewer- $5.68M Page 43 <br /> o County CIP includes total project costs <br /> o Chapel Hill (43%) and Carrboro (14%) will participate in cost-sharing <br /> o County and Towns will develop an inter-local agreement for construction <br /> costs <br /> o Construction scheduled to begin in March/April 2017 <br /> o Operating cost will be part of an agreement with Orange Water and Sewer <br /> Authority (OWASA) <br /> o OWASA availability fees and on site plumbing not included in above <br /> estimate. <br /> Rogers Road Proposed Sewer Alignment (map) <br /> Commissioner Jacobs suggested that staff examine OWASA's fees to look for <br /> differences from a typical project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.