Browse
Search
2016-233-E DEAPR - Fortress Fencing, LLC for fencing for backstop at CG Park
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-233-E DEAPR - Fortress Fencing, LLC for fencing for backstop at CG Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 3:16:56 PM
Creation date
5/4/2016 8:46:35 AM
Metadata
Fields
Template:
Contract
Date
4/26/2016
Contract Starting Date
4/26/2016
Contract Ending Date
5/30/2016
Contract Document Type
Contract
Amount
$4,545.00
Document Relationships
R 2016-233-E DEAPR - Fortress Fencing, LLC for fencing for backstop at Cedar Grove Park
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:9F423729-A57A-4E25-8C7D-5BDA1666lB7A <br /> FORK-T�ESS FENCI Qt LLC <br /> PO BOX 1377, CARRBORO, NC 27510 <br /> 402 Jones Ferry Road Carrboro,NC <br /> Office: 919-960-2911 fax: 960-2926 <br /> PRROPOSAL <br /> April 25,2016 <br /> CONTACT: Orange County Parks and Recreation- Dan Derby <br /> ADDRESS: 5800 HWY 86N Hillsborough, NC <br /> PRESENTED BY: Rick Paradis rick(a) -tressfencin�nc.coin (919) 730-3459 <br /> FORTRESS FENCING PROPOSES TO FURNISH AND INSTALL, <br /> Backstop (behind home plate): Replace 20 LF of existing Nvire with of 6 Ga. Class 2b Black <br /> Backstop Winj4s: Replace 60 LF of existing 10 ft. tall wire with new 9 ga. core class 2b black wire <br /> Overhand: Replace with black class 2b 9 ga. core chain link fabric, re-tie chain link. <br /> Haul and Scrap: Remove, haul and scrap all demolished wire and pipe as necessary. <br /> Price: 4,545.00 <br /> ------------------------------......__---__....---------------------------------------------------------------------------- <br /> PaJucent is to be executer/as follows: <br /> Fifty percent of this amount may be required for special order material and security deposit due upon <br /> contract signing prior to the start of aii),work. Upon satis factor),completion of the project,final payment <br /> is due. Late payment will be assessed a 1.5%per month penaI4 <br /> Total Price; -Deposit Cheelc# Balance <br /> Customer Signalam, Date: Salesman: <br /> Pricing twcludes sum Bing marking private utilities,evcrrration in rock or concrete,clearing,grading, <br /> removal of the Rigging spoils,core drilling,turf repair or seeding unless specifically'listed above. <br /> We alyweiale the oppornrnity to quote this work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.