Orange County NC Website
DocuSign Envelope ID:41 B27956-1 C1 7-475E-9558-D6D38ABE1436 <br /> 3. Basic Design Phases <br /> Basic Design Phase 1 <br /> Schematic Design (SD): Perform preliminary code analysis. Provide written project <br /> narrative, site plan, building floor plans, and cost estimate. Attend all meetings required <br /> by Owner. Submit to Owner and AHJ and coordinate for approval. <br /> Design Development(DD): Respond to all SD comments. Continue design process in <br /> all disciplines. Provide outline specifications, code summary sheet, site plans, floor plans, <br /> and wall sections. Provide room/door schedules, engineering drawings, and cost <br /> estimate. Attend all meetings required by Owner. Submit to Owner and AHJ and <br /> coordinate for approval. <br /> Construction Documents (CD): Respond to all DD comments. Provide full working <br /> drawings and specifications. Submit to Owner and AHJ and coordinate for approval. <br /> Provide cost estimate. Attend/lead all meetings required by Owner. <br /> Bidding: Lead and administer the Bidding and Negotiation process. <br /> Basic Design Phase 2 (to begin in the Summer of 2017) <br /> Construction Administration (CA): Basic fee includes construction administration for <br /> an estimated duration of ten (10) months. Construction is assumed to be phased and <br /> occupied. Perform architectural coordination, submittal review, and related Construction <br /> Administration. Lead the pre-construction meeting. Provide bi-weeklyjobsite visits (up to <br /> 22 visits anticipated) and lead monthly construction meetings (up to 10 meetings <br /> anticipated), punch list and final inspection. <br /> Closeout(CO): Record drawings and closeout of project. <br /> 4. Fee <br /> New Construction Renovation <br /> Preliminary Study $ 35,800 $ 35,800 <br /> Subtotal Preliminary Study $ 35,800 $ 35,800 <br /> Schematic Design $ 37,100 $ 44,500 <br /> Design Development $ 55,100 $ 62,000 <br /> Construction Documents $ 87,800 $ 97,100 <br /> Bidding $ 9,400 $ 10,400 <br /> Subtotal Basic Design Phase 1 $ 189,400 $ 214,000 <br /> Construction Administration $ 75,500 $ 82,900 <br /> Closeout $ 10,700 $ 11,600 <br /> Subtotal Basic Design Phase 2 $ 86,200 $ 94,500 <br />