Browse
Search
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 3:12:13 PM
Creation date
4/29/2016 2:17:18 PM
Metadata
Fields
Template:
Contract
Date
4/5/2016
Contract Starting Date
4/12/2016
Contract Ending Date
6/13/2018
Contract Document Type
Agreement - Services
Agenda Item
4/28/16
Amount
$249,800.00
Document Relationships
2018-523-E AMS - HH Architecture contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-346-E AMS - HH Architects EAC contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2016-228-E AMS - HH Architecture, P.A. to design and construction admin of the Environment and Agriculture Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:41 B27956-1 C1 7-475E-9558-D6D38ABE1436 <br /> • Electrical design includes: <br /> • Design shall include power, lighting, and fire alarm systems for the building <br /> • Design of electrical site utilities shall be limited to site lighting and the secondary <br /> distribution beyond the service transformer <br /> • Design for special systems (audio/visual, voice reinforcement, security, etc.)shall <br /> include empty raceway system for future inclusion of cabling and equipment by <br /> the Owner. Electrical infrastructure design shall be based on equipment layout <br /> and consumption/use data <br /> • Design for telecommunications shall include passive equipment only defined as <br /> outlets and associated cabling in structured raceway/cabletray systems <br /> terminating at the patch panels within the extents of the building. Fiber (data) <br /> and copper(telephone) backbones shall be included within the extents of the <br /> building. Design for active equipment (patch cords and active electronic <br /> components) is not included. Active equipment shall be provided by the Owner <br /> • Specialty equipment (food service, lab, etc.)electrical infrastructure design shall <br /> be based on equipment layout and consumption/use data <br /> • Renovation fee assumes full electrical system replacement <br /> • Fire Sprinkler Protection design includes: <br /> o To the extent required by Code, fire sprinkler design within and beneath the <br /> extents of the building structure will consist of establishing the criteria and <br /> performance requirements. Final design will be by the Construction Contractor <br /> • Structural design includes: <br /> • Prior to the start of design, a project specific geotechnical report is needed <br /> • Assumes a seismic class D or better <br /> • Assumes shallow foundations are acceptable with a first floor concrete slab-on- <br /> grade <br /> • Assumes a relatively flat site that will not require retaining walls <br /> • For new construction scenario, assumes simple structural steel framed <br /> rectangular building with a flat/low slope rood with braced frames for lateral load <br /> resistance and exterior metal stud walls or load bearing masonry walls <br /> • For renovation scenario, assumes relatively minor structural renovations and <br /> repairs to the existing building as follows: <br /> • Small punched openings in existing exterior walls (less than 10% of total <br /> wall area for any wall) <br /> • Small skylights or sonotube type openings restricted to the wood framed <br /> roof areas and not requiring modification to the existing steel roof truss <br /> members <br /> • Removal and replacement of the existing front wall with new wall <br /> construction that would likely need to accommodate new reinforced <br /> masonry shearwalls or structural steel braced frames to resist later loads <br /> along the front of the building <br /> • Scope does not include design for rooftop mechanical equipment or any <br /> other modifications to the existing roof structure, walls, parapets, or <br /> existing building structure <br /> • Assumes that changes will not require a change in use/occupancy or <br /> structural upgrade to meet current code requirements <br /> • If needed, structural design for a 2,000 sf premanufactured metal storage <br /> building will be limited to foundation design for a slab-on-grade foundation. <br /> Engineer will review the building manufacturer's design criteria and final <br /> foundation reactions and will be considered the structural engineer of record <br />
The URL can be used to link to this page
Your browser does not support the video tag.