Browse
Search
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 3:12:13 PM
Creation date
4/29/2016 2:17:18 PM
Metadata
Fields
Template:
Contract
Date
4/5/2016
Contract Starting Date
4/12/2016
Contract Ending Date
6/13/2018
Contract Document Type
Agreement - Services
Agenda Item
4/28/16
Amount
$249,800.00
Document Relationships
2018-523-E AMS - HH Architecture contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-346-E AMS - HH Architects EAC contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2016-228-E AMS - HH Architecture, P.A. to design and construction admin of the Environment and Agriculture Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:41 B27956-1 C1 7-475E-9558-D6D38ABE1436 <br /> ■ For both scenarios: <br /> • The project will require no substantial change in parking and <br /> driveway extents or configurations, nor addition of any landscape <br /> islands <br /> • Pavement overlay or other pavement remediation will be <br /> included as needed <br /> • Impervious surface area on the site will not be increased, but a <br /> detailed accounting of impervious areas will be required <br /> • Stormwater runoff patterns will not be changed on the site <br /> • No documentation or design work will be required related to <br /> perimeter buffers, for any new plantings, fences, or screens <br /> • No tree survey or inventory of existing vegetation will be required <br /> • No substantial change to the building's sanitary sewer or potable <br /> water services, nor any new grease trap, will be required <br /> • No new solid waste management facilities will be provided <br /> • No new sidewalk will be provided along or to any public street <br /> • A fire protection sprinkler supply main will be extended to the <br /> building from the existing water main on east side of property <br /> • No NCDOT review will be required <br /> • Engineer's work will include necessary coordination and <br /> approvals to secure a Zoning Compliance Permit from the Town <br /> of Hillsborough for the project, based on staff-level administrative <br /> reviews only <br /> • Technical specifications for sitework will be included on <br /> Engineer's drawings in Engineer's standard format <br /> • Engineer will not take the lead on preparing the Solid Waste <br /> Management Plan for the project, but will assist with site-related <br /> aspects of this document as needed <br /> • Project phasing information will be indicated on a single unified <br /> set of Site Plan documents and a single unified set of <br /> Construction Drawing documents. Separate phase-by-phase <br /> documents and review processes will not be required <br /> • Stormwater analysis and design is limited to surface collection <br /> and roof drainage. Anything beyond this scope would require <br /> additional fees (i.e. treatment, management, ponds, rain <br /> gardens, easements, etc.) <br /> • Plumbing design includes: <br /> • Domestic Water System Design within and beneath the extents of the building <br /> • Sanitary waste system design within and beneath the extents of the building <br /> • Roof drainage design shall be limited to piping only (no roofing or drains) <br /> • Natural gas piping design shall be limited to piping beyond the load side of the <br /> meter <br /> • Specialty equipment (food service, lab, etc.) plumbing infrastructure design shall <br /> be based on the equipment layout and equipment consumption/use data <br /> • Renovation fee assumes full plumbing system replacement <br /> • Mechanical design includes: <br /> • Design shall include air handling and heat transfer systems in and around the <br /> building structure <br /> • HVAC controls design <br /> • Natural gas piping design shall be limited to piping beyond the load side of <br /> the meter <br /> • Specialty equipment (food service, lab, etc.) HVAC infrastructure design shall <br /> be based on equipment consumption/use data <br /> • Renovation fee assumes full mechanical system replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.