Browse
Search
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-228-E AMS - HH Architecture, P.A. to design, construct the Environment & Agricultural Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2019 3:12:13 PM
Creation date
4/29/2016 2:17:18 PM
Metadata
Fields
Template:
Contract
Date
4/5/2016
Contract Starting Date
4/12/2016
Contract Ending Date
6/13/2018
Contract Document Type
Agreement - Services
Agenda Item
4/28/16
Amount
$249,800.00
Document Relationships
2018-523-E AMS - HH Architecture contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-346-E AMS - HH Architects EAC contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2016-228-E AMS - HH Architecture, P.A. to design and construction admin of the Environment and Agriculture Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:41 B27956-1 C1 7-475E-9558-D6D38ABE1436 <br /> Ill IN V I Ill INIVICIN I CK/'1VrRIl.AUL.I Ull L.I Ill IN I Ill <br /> UTILITY COSTS& USAGE Period: 7/1/2013-6/30/2014 <br /> Usage: Costs: $/SQ. FT Service Provider <br /> Electricity(KWH): 171,746 $16,572.90 $0.87 Duke Energy <br /> Water/Sewer(Gallons): 43,943 $821.51 $0.04 <br /> Natural Gas(Therms): 4,538 $4,510.73 $0.24 PSNC <br /> TOTAL: $21,905.14 $1.15 <br /> MAINTENANCE COSTS Period: 7/1/2013-6/30/2014 LIFE/SAFETY <br /> Costs: $/SQ. FT Fire Alarm System No <br /> Maintenance& Repair Costs: $8,476.08 $0.44 <br /> Intruder Alarm System No <br /> SERVICES: Sprinkler System No <br /> Daily Cleaning Service:AMS Emergency Generator No <br /> Building Maintenance :AMS <br /> FLOOR/AREA:First Floor <br /> -I <br /> Ass gnable Space Ass.grab'e Space Ncr.-assignable Space <br /> DEAPR Coop Extension Service areas <br /> 3.420 SF 4-649 SF 454 SF <br /> ■ Soil&Water Shared Coanty storage C"Culation areas <br /> 536 SF 3.671 SF 2.432 SF <br /> Farm Service Agency Mech,Elec�Plumb,Noic&'Data <br /> 1,355 SF 113 SF <br /> C-48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.