Orange County NC Website
14 <br /> Attachment 3: DCHC MPO,TARPO,and B-G MPO Project Priority Recommendations <br /> Current Project Project Priority Submitted Project Project Description <br /> Priority(April 2016) (June 2015) <br /> B-G MPO Projects <br /> 1 3 Buckhorn Road(SR Widen Buckhorn Road from U.S.70 to West Ten Road(SR1144)to <br /> 1114)Widening multiple lanes with bicycle and pedestrian facilities. <br /> Extend Mattress Factory Road northward across East Washington <br /> Mattress Factory Street and the NCRR/Norfolk Southern railroad right-of-way to <br /> 2 2 Road Extension to intersect U.S.70 and close the existing railroad crossover road <br /> U.S.70 connecting East Washington Street and U.S.70 approximately 240 <br /> feet to the east of the intersection of Mattress Factory Road and <br /> East Washington Street. <br /> 3 1 Mattress Factory Construct a new interchange at the existing grade-separated <br /> Road Interchange crossing of Mattress Factory Road and 1-85/1-40. <br />