Orange County NC Website
10 <br /> 1 o Parking lot construction adds 55 paved spaces <br /> 2 o Larger expansion (12,000) square feet possible based on needs expressed <br /> 3 in Master Aging Plan <br /> 4 <br /> 5 <br /> 6 Seymour Center Site with Parking (aerial map) <br /> 7 <br /> 8 <br /> 9 Seymour Center Remodel Option 1S Floor <br /> 10 <br /> 11 <br /> 12 Seymour Center Remodel Option 2-1 Floor <br /> 13 <br /> 14 Commissioner Jacobs suggested adding parking signage, to allow easier accessibility <br /> 15 for the seniors. <br /> 16 Commissioner Dorosin asked if the $990,000 includes the road shown on the map. <br /> 17 Jeff Thompson said no. <br /> 18 Commissioner Dorosin said he thought all these renovations were to be part of the <br /> 19 expanded campus. <br /> 20 Jeff Thompson said there is an item later in the presentation pertaining to this. <br /> 21 Travis Myren resumed the presentation: <br /> 22 <br /> 23 Policy Priorities <br /> 24 • Water and Sewer - $145,000: Page 76 <br /> 25 <br /> 26 Continuation Funding <br /> 27 • Buckhorn EDD Ph. 2 Ext. - $4.973 million: Page 80 <br /> 28 o County CIP includes total project costs <br /> 29 o Debt service to be financed with Article 46 funds <br /> 30 o Once constructed, the City of Mebane will own and operate the infrastructure <br /> 31 with no ongoing operating costs for the County. <br /> 32 <br /> 33 Efland Sewer to Mebane Buckhorn EDD (aerial photographs) <br /> 34 Continuation Funding <br /> 35 • Hillsborough EDD - Page 82 <br /> 36 o County CIP includes total project costs. <br /> 37 o County and Hillsborough will need a new utility inter-local agreement that <br /> 38 also includes a land use provision. <br /> 39 o Once constructed, the Town of Hillsborough will own and operate the <br /> 40 infrastructure with no ongoing operating costs for the County. <br /> 41 <br /> 42 Hillsborough EDD (map) <br /> 43 <br /> 44 Craig Benedict said the map shows the intersection of 1-85 and old NC 86. He said <br /> 45 there has been a great deal of economic interest in this area, and the sewer line will be helpful <br /> 46 with that. He said there will hopefully be some partnership with the Town of Hillsborough <br /> 47 regarding water extension. <br /> 48 Commissioner Rich said Hillsborough is growing rapidly and asked if water supply <br /> 49 capabilities may be an issue in this area. <br />