Orange County NC Website
DocuSign Envelope ID:A61 DD856-8C24-421313-131324-E011 DBDAAA9B /� 1;2_� /,(-;, <br /> FloorChem, Inc. 200 Powell Drive <br /> E-mail - floorchem ci)aol.com Suite 103 <br /> www.floorchem.com Raleigh, NC 27606 <br /> "A NC WBE Company' Phone: 919-854-9776 <br /> March 29, 2016 <br /> RE: R.E. Whitted Bldgs. — Flooring upgrades <br /> The following is a Revised proposal for installing the flooring in the above facility. Specifications are <br /> as follows: <br /> Single Solid Broadcast— 1/16" floor approx. 60 mils thick dry, <br /> 1. Remove existing VCT from floors <br /> 2. Diamond grind floors to remove VCT glue, clean & profile for acceptance of new coatings <br /> 3. Vacuum clean to remove dust and debris <br /> 4. Repair joints and/or cracks with flexible joint filler, membrane as needed <br /> 5. Apply coat of moisture-tolerant, high solids epoxy primer <br /> designed to reduce moisture vapor emissions and provide alkalinity control for concrete <br /> ivilh elevated moisture vapor transmission levels that exceed the acceptable limits <br /> 6. Apply full broadcast with clear epoxy resins and colored vinyl microchips <br /> 7. Apply grout/seal coat of epoxy resins <br /> 8. Apply top/seal coat of epoxy resin for a slip resistant finish <br /> Price quote for above will be <br /> Building A —Dental $ 9,526.00 <br /> approx. 1,6157=sq._ft.floors <br /> Building B—Medical $29,086.00 <br /> approx. 5,058± sq.,ft.floors <br /> Building B-Sterilization $ 1,223.00 <br /> approx. 213±sq._ft.floors <br /> Special Notes Please Read <br /> ► **Pricing effective for all areas to be done. <br /> ► **Any new concrete slab areas to receive coatings should not be sealed with anything. It should be <br /> wet cured with a light trowel finish. Any sealer on concrete will jeopardize the new coatings, as not <br /> all of the sealer can be removed completely from the concrete. <br /> Conditions <br /> ► Floors must cure for 24 hours before any equipment, furniture and 48 hours for automobile traffic is <br /> moved back on to the floors. This is very important and if not followed, will void warranty. <br /> ► Site will need adequate lighting for floors to be installed. This should be the same lighting when <br /> floor is to be inspected. <br /> ► Adequate power will be needed to operate certain flooring and hand equipment, vacuums etc. <br /> ► If work is performed in cold weather, then slab must be a minimum of 55° F at installation. <br /> ► If removal of existing floor covering, such as carpet, vinyl or ceramic tile, is required, then the <br /> owner or GC is responsible for supplying a dumpster for disposal of such materials. <br />