Browse
Search
2016-223-E AMS - Tibbens Construction, Inc. for Whitted Rm. 210 renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-223-E AMS - Tibbens Construction, Inc. for Whitted Rm. 210 renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:45:18 AM
Creation date
4/25/2016 3:14:30 PM
Metadata
Fields
Template:
Contract
Date
4/22/2016
Contract Starting Date
4/18/2016
Contract Ending Date
5/27/2016
Contract Document Type
Agreement - Construction
Amount
$14,365.00
Document Relationships
R 2016-223-E AMS - Tibbens Construction, Inc. for Whitted Room 210 Renovation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: C057BFCE-FE50-48B8-990C-1588389F9587 <br /> E s t Im tvo% <br /> 11 II <br /> ..................................................................................................................................:..... .1...... ..................... <br /> FROM: Tibbens Construction Page. No. 1 of 1 <br /> 849 Moose Tracks Trl .Cedar Grove NC. <br /> 27231 919-643-2856 c#919-667-5366 <br /> PROPOSAL SUBMITTED TO: <br /> Orange Co. ATT: Asset management. Whitted bldg. Rm 210 , parks & <br /> Name: recreations bldg.area#3 renov. <br /> Phone: 919-245-2628 <br /> Street: 131 west Margaret sLane <br /> City: Hillsborough NC. 27278 <br /> 1 propose to furnish all materials and perform all labor necessary to complete the following: <br /> Renovations to Room#210 in the Whiffed Biulding & area #3 in adjacent recreation biulding as <br /> discussed at site visit and as per plans provided by owner, <br /> Demo walls at area#3 in recreation building and relocate furniture to whitted building room#210 <br /> as discussed at site visit. $1,800.00 <br /> Construct 63'x-3 5/8"metal stud walls up p to existing ceiling. <br /> -New walls will be sheeted with 5/8" d wall and painted to match existin g walls. <br /> -2 new Doors, trim and hardware will match existing. $12,665.00 <br /> Existing fire alarm and sprinkler system will be modified as needed as discussed at site visit on <br /> 3-29-2016 with fire marshal for Orange Co. The modifications are as follows: <br /> -Install 2 sprinkler heads $2000.00 <br /> -Engineering fees for fire sprinkler work. $1,500.00 <br /> -1 strobe light at new rear office room #210 Whitted building, relocate 1 smoke detector in room <br /> #210 to new storage room#212 remaining. <br /> 1 heat detector in kitchen and 1 strobe light in main room at area#3 adjacent recreation <br /> building. $2,136.00 <br /> -Microwave oven must be removed from kitchen at room #211 at whitted bldg. or place new <br /> door to close of kitchen. Price for new door will be- $1,500.00 <br /> Electrical will be installed as per.code and per plans provided. (All existing receptacles remain) <br /> Race ways for CAD-5 cable will be terminated above ceiling at 4 locations.( Existing to remain) <br /> 7 new receptacle outlets to be added. <br /> 3 new light fixtures to be added.( Match existing) <br /> All receptacles and/or switches at existing exterior masonary walls will be surface mounted. <br /> Existing flooring to remain. $5,000.00 <br /> All permit fees and fire marshal fees will be paid by contractor. <br /> Estimated time to complete will be 3-4 weeks weeks. . <br /> www.socrates.com Page 1 of 2 SS4301-340•Rev.05/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.