Browse
Search
2016-221-E DEAPR - SePRO Corp. - participate in 2nd year of Eno River Hydrilla Mgmt. Task Force Pilot Study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-221-E DEAPR - SePRO Corp. - participate in 2nd year of Eno River Hydrilla Mgmt. Task Force Pilot Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:45:09 AM
Creation date
4/25/2016 2:50:10 PM
Metadata
Fields
Template:
Contract
Date
3/1/2016
Contract Starting Date
4/1/2016
Contract Ending Date
10/20/2016
Contract Document Type
Contract
Amount
$8,057.00
Document Relationships
R 2016-221-E DEAPR - SePRO Corporation - participation in second year of Eno River Hydrilla Management Task Force pilot study
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: CCD5A630-F3A4-4984-86E5-2F9BFE4A9469 <br /> 2 <br /> study (Attachment B). Details were provided on the problem, the results of an Environmental <br /> Assessment for the proposed project, and the selection of a contractor to apply and monitor the <br /> herbicide in the Eno. Additional public outreach efforts were conducted throughout the <br /> watershed (Attachment C). <br /> Pilot study herbicide treatments in the Eno River began in late May 2015. Low stream flows <br /> over the summer aided in maintaining a consistent concentration of fluridone, the active <br /> ingredient in the herbicide, throughout the treatment zone, from Lawrence Road east of <br /> Hillsborough downstream to Roxboro Road in Durham. Monitoring of the concentration of <br /> fluridone in various locations along the river occurred throughout the duration of the study. <br /> Monitoring of native vegetation, snails, crayfish and fish above and within the treatment zone <br /> was also conducted before and during the hydrilla treatment. Bleaching of hydrilla was <br /> observed after just one week of herbicide treatments. Within four weeks, there was notable <br /> reduction in the density of hydrilla in the treatment zone. Further herbicide treatment resulted in <br /> dramatic differences in hydrilla density between the treatment area and the untreated area <br /> upstream. Nearly-complete removal of visible hydrilla vegetation was reported at locations <br /> within the area of treatment (Attachment D). <br /> The Eno Hydrilla Management Task Force will continue to evaluate data from surveys of the <br /> Eno River ecosystem both within and above the treatment zone. Native vegetation is <br /> responding positively. It is anticipated that the results of the first year of the pilot study will be <br /> overwhelmingly positive, and that the Task Force will proceed with the second year of <br /> treatment. Over the winter months, the Task Force will consider using a lower concentration of <br /> fluridone, starting the injection process earlier in the growing season, and adding a second <br /> injection location in order to further minimize the apparent impact to native plants. Following <br /> completion of the full two-year pilot study, the Task Force will begin to discuss long-term <br /> objectives for the management of hydrilla throughout the Eno River watershed. <br /> Lastly, the County recently completed a contract with the NC Division of Water Resources for <br /> the addition of sterile grass carp to Lake Orange, which is infested with hydrilla. Grass carp are <br /> routinely used to help control hydrilla in lakes and reservoirs. <br /> FINANCIAL IMPACT: The total cost of this two-year pilot study is $150,000, with the NC <br /> Division of Water Resources providing half of the funding. DEAPR has agreed to provide <br /> $10,716 for the pilot study. Additional hydrilla management, especially if the treatment area is <br /> increased, could require some level of financial commitment on the part of the County after the <br /> pilot study concludes in FY2015-2016. <br /> SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to <br /> this agenda item: <br /> • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND <br /> ENVIRONMENTAL POLICIES <br /> The fair treatment and meaningful involvement of people of all races, cultures, incomes <br /> and educational levels with respect to the development and enforcement of <br /> environmental laws, regulations, policies, and decisions. Fair treatment means that no <br /> group of people should bear a disproportionate share of the negative environmental <br /> consequences resulting from industrial, governmental and commercial operations or <br /> policies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.