Browse
Search
2016-205-E AMS - Swanson and Associates, P.A. for Veterans Memorial Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-205-E AMS - Swanson and Associates, P.A. for Veterans Memorial Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:42:10 AM
Creation date
4/12/2016 8:31:43 AM
Metadata
Fields
Template:
Contract
Date
4/1/2016
Contract Starting Date
4/11/2016
Contract Ending Date
12/31/2016
Contract Document Type
Contract
Amount
$3,500.00
Document Relationships
R 2016-205-E AMS - Swanson and Associates, P.A. for Veterans Memorial Design
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 3D33619A-OD44-4FDD-8749-BC3C4975OD59 <br /> Orange County Veterans Memorial <br /> Scope of Services and Fee Proposal <br /> November 11,2015 AMENDED March 30,2016 <br /> Page 2 <br /> STEP TWO: CONCEPT REFINEMENT <br /> Since the Committee has agreed that the general design concept for the former site <br /> instilled the spirit of the project's mission of being a ceremonial, contemplative and <br /> gathering space, our next step will be to refine the design to fit the setting of the new site. <br /> Since the new surrounding site conditions are so different from those of the former site <br /> (natural wooded setting versus an open cemetery setting), the concept will need some <br /> fresh thinking. However,we can benefit from the prior design process studies. Based on <br /> the May 28, 2015 site meeting with the Committee,the Consultant understands the <br /> essence that the new design must address: that of a quiet, reflective space that <br /> recognizes and honors the living and late veterans who have served their country. <br /> At the May 28 site meeting, members of the Committee provided additional input and <br /> thoughts. The Consultant envisions that the first task in the Concept Refinement Phase is <br /> to come up with a new scheme and layout using appropriate, site-sensitive materials. <br /> This will include defining the expected users, pedestrian access, vehicular parking,and <br /> general circulation. <br /> The Consultant will prepare a concept and will present it to the Committee for <br /> consideration. The goal will be to marry the previously approved design to the new site, <br /> but in this very different setting, significant design components must be altered. The <br /> Consultant anticipates making an on-site presentation so the Committee can visualize <br /> the design in the actual setting among the trees. The Consultant will look to the <br /> Committee for feedback and input and will proceed to the final design concept. <br /> 2. DELIVERABLES <br /> • Plan view showing the design in detail,as well as in the larger context of the <br /> surrounding site. <br /> • Section drawings and possibly perspective sketches to illustrate human scale views of <br /> the concept design from selected vantage points. <br /> • Preliminary estimate of probable construction costs for concept plan purposes only. <br /> Note: These deliverables may not meet all aspects of the fundraising requirements; <br /> the Consultant can provide these materials as an additional service. <br /> 3. SERVICES NOT INCLUDED <br /> • A survey of the site and proposed conditions;this shall be provided by the Owner in <br /> electronic CAD (.dwg) format. <br /> • The production of design development drawings, construction documents, <br /> assistance with the approval process, and construction administration services. <br /> 4. SCHEDULE <br /> On receipt of Orange County to provide base map of the existing site (as-built of <br /> contract existing conditions for the entire site, and plans for the proposed building <br /> and road realignment. These plans will be provided in AutoCAD (.dwg) <br /> format. <br /> Allow one month Completion of inventory, analysis and programming. <br /> Allow two months Presentation to Committee of refined concept design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.