Browse
Search
Agenda - 04-12-2016 - 1 - Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools (OCS) Priorities for the Potential Bond Referendum Funds
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 04-12-2016 - Work Session
>
Agenda - 04-12-2016 - 1 - Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools (OCS) Priorities for the Potential Bond Referendum Funds
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:34:11 PM
Creation date
4/8/2016 2:26:59 PM
Metadata
Fields
Template:
BOCC
Date
4/12/2016
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 04-12-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kdditional Details of Older School Facility Recommendations (by Phase/School) 8 <br /> Project Na Phase(funding source) Estimated Cost Health/Life Safety/Code A Capacity Positively Impacts Security Upkeep/Maintenance Completed Project Will Meet <br /> $/Broken Infastructure OCStandards <br /> Glenwood Elementary Address water infiltration issues <br /> •(maintain existing buildings,provide 1 • Accessible bathrooms maintenance and repairs <br /> secure lobby and front entrance, $940,000(District Fund Balance) $ ' • Correct chronic flooding,moisture and mold issues no increase yes no year solution) no <br /> address health/safety concerns and <br /> • <br /> handicapped accessibility) Correct fire/life safety/egress/code concerns <br /> • Address pedestrian/vehicular conflicts,separate bus/car drop off locations, <br /> Chapel Hill High appropriate queuing lengths <br /> (deconstruction and replacement • HVAC replacement for indoor air quality major renovations to remaining <br /> of an existing building,renovation 1 • Address water infiltration issues facilities provide long-term yes <br /> of remaining buildings,new secure (2016 Bond) $52.41 million • Provide handicapped accessible main entrance and improved access throughout campus 105 seats yes maintenance solution (eliminates reliance on mobiles) <br /> lobby and front entrance,greater con- • Correct fire/life safety/egress/code concerns (up to 50 year solution) <br /> nectivity of existing buildings) • Correct chronic flooding,moisture and mold issues <br /> • Provide safe science labs <br /> PreK/Phoenix Academy Hip; <br /> Lincoln Center • HVAC replacement for indoor air quality <br /> (deconstruction and replacement • Provide handicapped accessible main entrance and improved access throughout campus <br /> 189 el entary major renovations to remaining <br /> em <br /> of existing buildings,renovation of 1 • Address pedestrian/vehicular conflicts,separate bus/car drop off locations. facilities provide long-term yes <br /> remaining buildings,PreK centraliza- (2016 Bond) <br /> $22.62 million appropriate queuing lengths 50-100 high yes maintenance solution (eliminates reliance on mobiles) <br /> tion,Phoenix Academy expansion, • Correct moisture and mold issues school (up to 50 year solution) <br /> administrative workspace on second • Correct fire/life safety/egress/code concerns <br /> floor) <br /> • Correct chronic moisture and mold issues <br /> Ephesus Elementary major renovations provide <br /> (renovation,new secure lobby and 2 • Correct fire/life safety/egress/code concerns long-term yes <br /> front entrance,additional space per (request access to planned new $155 •4 million • Provide handicapped accessible main entrance and improved access throughout campus 137 seats yes maintenance solution (eliminates reliance on mobiles) <br /> OC standards) schools funds) • Address pedestrian/vehicular conflicts,separate bus/car drop off locations, (up to 50 year solution) <br /> appropriate queuing lengths <br /> Seawell Elementary • Correct flooding,chronic moisture and mold issues <br /> (deconstruction and replacement 2 • Correct fire/life safety/egress/code concerns major renovations to remaining <br /> of an existing building, (request access to planned new $15.74 million • Provide handicapped accessible main entrance and improved access throughout campus 119 seats es facilities provide long-term yes <br /> g g' (� p pPe p g P yes solution (eliminates reliance on mobiles) <br /> of remaining buildings,new secure schools funds) • Address pedestrian/vehicular conflicts,separate bus/car drop off locations, <br /> lobby and front entrance) appropriate queuing lengths (up to 50 year solution) <br /> Estes Hills Elementary • Correct flooding,chronic moisture and mold issues <br /> (deconstruction and replacement 2 • Correct fire/life safety/egress/code concerns major renovations to remaining <br /> of an existing building,renovation facilities provide long-term yes <br /> g g, (request access to planned new $16.73 million • Provide handicapped accessible main entrance and improved access throughout campus 58 seats yes maintenance solution (eliminates reliance on mobiles) <br /> of remaining buildings,new secure schools funds) • Address pedestrian/vehicular conflicts,separate bus/car drop off locations, (up to 50 year solution) <br /> lobby and front entrance) appropriate queuing lengths <br /> • Correct flooding,chronic moisture and mold issues <br /> Phillips Middle major renovations to remaining <br /> 2 • Correct fire/life safety/egress/code concerns <br /> (renovation provides additional pro- facilities provide long-term <br /> gram space per OC standards,new (request access to planned new $9.4 million • Provide handicapped accessible main entrance and improved access throughout campus no increase yes maintenance solution yes <br /> secure lobby and front entrance) schools funds • Address pedestrian/vehicular conflicts,separate bus/car drop off locations, (up to 50 year solution) <br /> appropriate queuing lengths <br /> Carrboro Elementary • Correct flooding,chronic moisture and mold issues major renovations to remaining <br /> (deconstruction and replacement • Correct fire/life safety/egress/code concerns <br /> 3 facilities provide long-term yes <br /> of an existing building,renovation (unfunded future capital) $1355 million • Provide handicapped accessible main entrance and improved access throughout campus 52 seats yes maintenance solution (eliminates reliance on mobiles) <br /> of remaining buildings,new secure • Address pedestrian/vehicular conflicts,separate bus/car drop off locations, (up to 50 year solution) <br /> lobby and front entrance) appropriate queuing lengths <br /> I' • Correct flooding,chronic moisture and mold issues major renovations to remaining <br /> repo,auon -I 3 facilities provide long-term <br /> ( pro\is c:,nnc:,cc urc (unfunded future capital) $5.48 million • Correct fire/life safety/egress/code concerns no increase yes yes solution yes <br /> lobby and front entrance) • Provide handicapped accessible main entrance and improved access throughout campus (up to 50 year solution) <br /> no increase <br /> (capacity <br /> major renovations to remaining <br /> Culbreth Middle 3 • Correct fire/life safety/egress/code concerns increase facilities provide long-term yes <br /> (renovation,except for science lab) (unfunded future capital) $5.8 million occurred as yes maintenance solution (this school currently meets of recent Orange County Standards) <br /> science wing (up to 50 year solution) <br /> addition) <br />
The URL can be used to link to this page
Your browser does not support the video tag.