Browse
Search
Agenda - 04-12-2016 - 1 - Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools (OCS) Priorities for the Potential Bond Referendum Funds
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 04-12-2016 - Work Session
>
Agenda - 04-12-2016 - 1 - Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools (OCS) Priorities for the Potential Bond Referendum Funds
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:34:11 PM
Creation date
4/8/2016 2:26:59 PM
Metadata
Fields
Template:
BOCC
Date
4/12/2016
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 04-12-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A 3 <br /> 00.4 <br /> >i of /4 , a <br /> fi • ,,,, Orange County Schools <br /> jokholopide 1.1101 111 1111 1111 I II I <br /> VIII I�II��IVmo mrou�mmioi�io "" 1444 <br /> OCS Facility Recommendations <br /> • 2013 Facilities Assessment reflected needed repairs/replacements/additions in excess of$160M <br /> as of the date of the assessment. <br /> • OCS receives approximately$2.6M for capital funding annually. <br /> • Of the$160M overall needs, OC Board of Education prioritized projects to funding levels of$50, <br /> $60 and $70M,with projects in the following areas given highest priority: <br /> o Safety; <br /> o Replacement of antiquated and failing mechanical equipment that would exceed normal <br /> CIP funding capabilities; <br /> o Cedar Ridge High School classroom wing addition; <br /> o Replacement of Transportation facilities; <br /> o Upgrade and replacement of food service facilities and equipment. <br /> • Phase 1 projects per the attached sheet would be completed assuming a $50M allocation of the <br /> potential 2016 bond. <br /> • Unfunded projects would be addressed if higher allocation from potential 2016 bond were <br /> allocated and/or through future CIPs. <br /> • Based on approved CAP Certificates to date, OCS has adequate elementary and middle school <br /> capacity for the current 10-year CIP period. The Cedar Ridge classroom addition will address the <br /> needed high school capacity, which is projected to reach SAPFO capacity by 2022. A <br /> planning/constructing/opening period of approximately three years is anticipated. <br /> • Replacement and consolidation of Transportation facilities is included in the OCS Phase 1 <br /> request, but is envisioned as a joint project with CHCCS. OCS is the recognized LEA for <br /> Transportation for both OCS and CHCCS(State only recognizes one per County). The 1950's <br /> vintage Transportation facilities for both CHCCS and OCS are woefully inadequate. Some buses <br /> will not fit and still close the bay doors, for example. <br /> • Potential bond funds will allow OCS to divert future pay-as-you-go CIP funds to other critical <br /> projects addressed in the Facilities Assessment, but not included in Phase 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.