Browse
Search
Agenda - 04-12-2016 - 1 - Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools (OCS) Priorities for the Potential Bond Referendum Funds
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 04-12-2016 - Work Session
>
Agenda - 04-12-2016 - 1 - Review Chapel Hill Carrboro City Schools (CHCCS) and Orange County Schools (OCS) Priorities for the Potential Bond Referendum Funds
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:34:11 PM
Creation date
4/8/2016 2:26:59 PM
Metadata
Fields
Template:
BOCC
Date
4/12/2016
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 04-12-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEAWELL ELEMENTARY SCHOOL <br /> CURRENT CONDITIONS: <br /> Y <br /> Operating over capacity <br /> -� ,. �- • Six mobile units on-site housing classroom space <br /> ,..r <br /> • Opera• Administration area, physical education area & staff support <br /> ',� - ' 3 areas are too small <br /> 'w i • Media center support spaces are lacking <br /> ,i ;� " • Lack of storage rooms <br /> FIRE LANE �� • Aging mechanical system <br /> l; .=5 • Campus-style layout with classrooms exiting to the exterior <br /> i1,, TRY 'le., ' • Aging kitchen equipment <br /> iiisn_45.4 •'aM IN/DI ING eR: • <br /> Exterior structural remediation needed at one of the classroom <br /> + BLDG <br /> '• R NDVATI/ 5 pods <br /> ` • Year Built: 1969 <br /> LOWLER BUILDING - A % Additions: 1975, 1989 <br /> RENOVATION y �� ;_ <br /> • <br /> II -_y- ' 4\' Last Renovation: <br /> i' .. 41 t. , � Area: 58,629 sf <br /> t '�'. 87.5• <br /> ' ,-** Acres: <br /> P ,•" .t Student Capacity (per SAPFO): 466 Students <br /> S; ..,. 2013 ADM: 539 Students <br /> Construction: Load bearing brick construction appears to be the <br /> — — " '' A} t main structural system for the original building and load bearing <br /> CMU and steel frame construction for the 1989 addition <br /> RECOMMENDATIONS r^''w <br /> dite • <br /> �- - <br /> 1 ea 'rim, <br /> • Deconstruct the five classroom pods. �' ., . " <br /> • Renovate the existing administration/dining building & Lowler - w , - . - <br /> Building. - <br /> • Eliminate use of mobiles as classrooms - . • Y - , 4411,I <br /> `1 <br /> • Provide additional program space to meet space standards & 4 l ��� _ '� ; _ <br /> replace deconstructed classroms (do not increase kitchen). ---_ �--f �� '" <br /> • Increase capacity by 119. - - I <br /> or. ,- _ _ <br /> r <br /> HITS T �ofto <br /> MOSELEYARC C S <br /> X: GI TY SGI-100LS <br />
The URL can be used to link to this page
Your browser does not support the video tag.