Orange County NC Website
(Excerpt of Section 6.23.3) <br />2. Non-Residential Development <br />Amended 114/94:10/19/99:8/21/01 <br />Attachment 1 12 <br />DISTRICT <br />IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS <br />(NON-RESIDENTIAL) <br />UNIV-CA <br />Same as Residential (See previous Table) <br />UNIV-PW <br />CANE-CA <br />5-acre minimum lot size, with potential of up to five lots as small as <br />two acres for lots of record October 19, 1999 (Amended 10-19-99); <br />AND <br />6% impervious surface limit. <br />* BMPs cannot be used to satisfy watershed impervious surface <br />requirements. <br />U-ENO-CA <br />2-acre minimum lot size <br />AND <br />6% impervious surface limit. <br />* BMPs cannot be used to satisfy watershed impervious surface <br />requirements. <br />CANE-PW <br />5-acre minimum lot size with potential of up to five lots as small as <br />two acres for lots of record October 19, 1999 (Amended 10-19-99); <br />AND <br />50% ISR for all fire stations and solid waste collection centers; <br />AND <br />12% ISR for all other non-residential uses; <br />AND <br />on-site infiltration of the first inch of stormwater runoff; <br />AND <br />a limit of 1.0% of the watershed for non-residential use (139 acres <br />in CANE-PW). <br />* BMPs cannot be used to satisfy watershed impervious surface <br />requirements. <br />LITTLE-PW <br />2-acre minimum lot size <br />AND <br />50% ISR for all fire stations and solid waste collection centers; <br />AND <br />12% ISR for all other non-residential uses; <br />AND <br />on-site infiltration of the first inch of stormwater runoff; <br />AND <br />a limit of 1.0% of the watershed for non-residential use (139 acres <br />in CANE-PW). <br />* BMPs cannot be used to satisfy watershed impervious surface <br />requirements. <br />* BMP's as mandated by the Stormwater Management Program for Lands within the Neuse River Basin are allowed. <br />