Browse
Search
2016-195-E AMS - Statler Gilfillen Architect MBA - construction admin services for modifications at Whitted Rm. 210
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-195-E AMS - Statler Gilfillen Architect MBA - construction admin services for modifications at Whitted Rm. 210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 9:39:41 AM
Creation date
4/4/2016 8:32:19 AM
Metadata
Fields
Template:
Contract
Date
3/21/2016
Contract Starting Date
3/28/2016
Contract Ending Date
5/30/2016
Contract Document Type
Contract
Amount
$500.00
Document Relationships
R 2016-195-E AMS - Statler Gilfillen Architect MBA for construction admin services for modifications of the Whitted Building Rm. 210, per proposal dated 3-10-16
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A933F1D1-BB8A-4AA6-BA5B-85764B946906 <br /> GENERAL CONDITIONS AND NOTES <br /> Page 1 of 3 <br /> June 18,2015 <br /> PROJECT <br /> Modifications for the DEAPR <br /> First Floor, Room 201 <br /> Whitted Building A <br /> 300 Tyron Street <br /> Hillsborough, NC 27278 <br /> ORIGINAL BUILDING DOCUMENTS ON FILE <br /> Original construction documents are available for review before bidding and during construction at the <br /> offices of <br /> Orange County Asset Management <br /> 3rd Floor <br /> 131 West Margaret Lane <br /> Hillsborough, NC 27278 <br /> 919-245-2625. Please coordinate times to review the drawings. <br /> DOCUMENTS <br /> GENERAL CONDITIONS AND NOTES(3 pages) <br /> Sheet 1: PLAN <br /> Sheet 2: LIGHTING AND CEILING PLAN <br /> Sheet 3: ORIGINAL ARCHITECTURAL PLAN <br /> Sheet 4: EXISTING CEILING AND SPRINKLER PLAN <br /> Sheet 5: PHOTO OF EXISTING SPACE <br /> Sheet 6: PHOTO OF EXISTING DOOR <br /> Sheet 7: PHOTO OF EXISTING WINDOW DETAIL <br /> VIEW SPACE <br /> Contractor will view the space before submitting a bid <br /> TENANT READY AND CLEANUP <br /> Unless defined otherwise in these documents,when the construction is completed,the contractor will <br /> leave the space ready for the installation of furniture and the occupancy of tenants.This includes <br /> cleaning,vacuuming,and washing inside of windows in the all areas that were affected by the <br /> construction. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.