Orange County NC Website
Attachment 2 7 5l W"t¢PhIMN4yFord5C-rr4LY RALLIrh 1.1,40dIli FA 1,, 1¢kA476 1 5 <br /> lo 818 ..,3C1 HA_ 919 828 2:Sr1;:1 F/H, 190.4 Algr.E4.alOM <br /> MINE <br /> March 1, 2016 <br /> Jeffrey E. Thompson <br /> Director, Asset Management Services <br /> Orange County Government <br /> 131 West Margaret Lane, Suite 300 <br /> PO Box 8181 <br /> Hillsborough, NC 27278 <br /> Sent via email to:jethompson @orangecountync.gov <br /> Re: Orange County Environment and Agriculture Center <br /> HH Project#: 15-082 <br /> Dear Jeff, <br /> HH Architecture is pleased to present this proposal for the design of the new Orange County <br /> Environment and Agriculture Center. <br /> 1. Scope: <br /> We propose to include architectural and engineering services for the design of a new <br /> Environment and Agriculture Center(EAC)that will replace the current facility located at 306 <br /> Revere Road, Hillsborough, NC. The new facility will be located on the same site as the existing <br /> facility. <br /> The facility will include divisions of the Department of Environment, Agriculture, Parks & <br /> Recreation (DEAPR), the local Cooperative Extension Office, Soil and Water Services, the local <br /> Farm Services Agency, and the local Forestry Service operations office. The facility will also <br /> include meeting spaces, a demonstration kitchen, and outdoor demonstration areas. The existing <br /> building is currently approximately 17,000 square feet. The new facility is anticipated to become <br /> more efficient and therefore is planned to be an approximately 13,000 sf single-story building. <br /> The construction budget is set at approximately$3,047,000. <br /> For this project, the Owner intends not to pursue a Triangle J High Performance rated building, <br /> but rather utilize the Triangle J High Performance Guidelines (v1.0, 2001)as a guideline only, and <br /> shall in no way imply that actual Triangle J points or any level of Triangle J certification process <br /> are being pursued. Because no level of actual Triangle J certification is being pursued, <br /> documentation procedures are not included as a part of the consultant's work. <br />