Browse
Search
Agenda - 04-05-2016 - 7-b - Award of Environment & Agriculture Center Professional Services Agreement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 04-05-2016 - Regular Mtg.
>
Agenda - 04-05-2016 - 7-b - Award of Environment & Agriculture Center Professional Services Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2016 8:12:59 AM
Creation date
3/31/2016 4:39:32 PM
Metadata
Fields
Template:
BOCC
Date
4/5/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 04-05-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Security System Component Design $ 3,450 $ 3,450 <br /> Storage Building Interior Renovation Design $ 9,030 $ 9,030 <br /> Site Lighting Design $ 2,875 $ 2,875 <br /> Lateral Load Analysis and Code Upgrades $ - $ 11,500 <br /> Substantial Parking Lot Configuration $ 9,200 $ 9,200 <br /> Landscape Buffer Standards Compliance $ 9,200 $ 9,200 <br /> Sprinkler Supply Connection to Revere Rd. $ 5,750 $ 5,750 <br /> Sidewalk Along Revere Rd. or Cedar Grove <br /> Rd. $ 3,450 $ 3,450 <br /> Enhanced Solid Waste/Recycling Facilities $ 2,300 $ 2,300 <br /> Stormwater Analysis and Design $ 20,700 $ 20,700 <br /> Subtotal Contingency Items $ 65,955 $ 77,455 <br /> 5. Excluded Services <br /> Excluded Architectural Services, to be billed as Additional Services only if required: <br /> • Project scope increase or change <br /> • Design of outdoor facilities <br /> • Design of the additional space beyond what is listed in the programming document <br /> • Additional monthly construction meetings beyond the anticipated 10 <br /> • Additional architectural CA visits beyond the anticipated 22 <br /> • Additional MEP CA visits beyond the anticipated 12 <br /> • Additional structural CA visits beyond the anticipated 5 <br /> • Additional site/civil CA visits beyond the anticipated 4 <br /> • Public meeting attendance <br /> • Renderings <br /> • Fundraising meeting attendance <br /> • Furniture, Fixtures, and Equipment(FF&E)selection and design <br /> • LEED design <br /> • Express review <br /> • Hazardous materials testing and abatement design <br /> • Existing roof modifications that require additional structural analysis and/or design <br /> • Retaining wall design <br /> • Site signage design <br /> • Adaptive re-use or augmentation of existing MEP systems for renovation <br /> • Life cycle and operating cost analysis <br /> • Energy measurement and verification plans <br /> • Computer day-lighting simulations <br /> • Design of emergency/stand-by generator system <br /> • Design of voice reinforcement wiring/equipment <br /> • Commercial kitchen design <br /> • Walk-in cooler and freezer design <br /> • Audio Visual systems design <br /> • Design for complex or large-scale bid alternates <br /> • Chapter 17 special inspections <br /> • Sanitary sewer or sanitary service extension <br /> • New driveway permit or utility encroachment permit from NCDOT <br /> • Traffic impact analysis <br /> • Geotechnical investigations <br /> • Environmental investigations <br />
The URL can be used to link to this page
Your browser does not support the video tag.