Browse
Search
Agenda - 08-21-2007-4x
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 08-21-2007
>
Agenda - 08-21-2007-4x
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:37:07 PM
Creation date
8/28/2008 11:03:53 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Document Type
Agenda
Agenda Item
4x
Document Relationships
Minutes - 20070821
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as <br />Appendix 6. School Construction Project Components <br /> • Purchase and contracted pricing of property <br /> • Survey <br />Site Acquisition -Tasks and . Deed recording <br />costs associated with acquiring <br />Appraisals <br />a site <br /> • Soils, environmental, suitability testing <br /> • Le al fees associated with urchase and recordin <br /> • Pre-grading <br /> • Grading to include playing fields and playgrounds <br /> • Installation of storm water run-off drainage <br />Hard Construction -Site & Soil suitability testing (rock) <br />Vertical Tasks and costs of <br />" <br />" <br />" <br />" Utility extension/installation <br />horizontal <br />and <br />vertical Sidewalks <br />construction: all construction <br />activities for the actual site • Turn lanes <br />and building • Building Structure and Systems (includes General <br /> Contractor and all Sub-Contractors <br /> • Municipal Requirements <br /> • Landsca in <br />Hard Construction - Off- <br />Site Off-site Traffic Improvements <br />Tasks and costs of Water and Sewer Service to the Site <br />"horizontal" construction: all . Off-Site Environmental Mitigation <br />construction activities for the . Trails and Greenway System <br />surrounding area, not • Related Design <br />including the building and <br />direct site <br /> • Prime Construction Contracts (includes general <br />Construction Costs - contractor, electrical contractor, HVAC contractor, <br />Costs of constructing a new plumbing contractor) <br />facility or renovating an Other construction related work <br />existing one Sprinkler <br /> • Ex anded Water Flows <br />
The URL can be used to link to this page
Your browser does not support the video tag.