~~ <br />iii) Installing covered walkways at student drop-off areas, main entrances and <br />bus loading areas <br />iv) Reducing student drop-off lanes <br />It is also important to note that the cost of the regulatory process has historically <br />been high and require from 12 to 24 months before the construction project can <br />begin. <br />19 <br />