Browse
Search
Agenda - 08-21-2007-4v
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 08-21-2007
>
Agenda - 08-21-2007-4v
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:37:21 PM
Creation date
8/28/2008 11:03:44 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Document Type
Agenda
Agenda Item
4v
Document Relationships
Minutes - 20070821
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />Comprehensive Plan Update Process <br />Proposed ~4mendments to Phase II <br />Note: The Comprehensive Plan Update Process that was approved by the Board of County <br />Commissioners on October 3, 2006 did not address the use of .consulting services. The proposed <br />amendments to Phase II of the Update Process incorporate the appropriate portions of Clarion <br />Associates' contractual Scope of Services into the Update Process. Proposed amendments are "tracked" <br />(AII underlined text is new). <br />Phase ll, Remaining Elements Developed: <br />1) Consultant Reconnaissance/Data Collection (July-Seat. '07 <br />a) Interview Element Managers and collect documents for synthesizing_ <br />b) b~-Identify any gaps in data or information and develop detailed draft table <br />of contents for each Element. <br />c) Discuss and identify the specific roles and responsibilities of the. consultant and <br />Element ManagerL) for the creation of each respective Plan element. This will <br />include an understanding of how the consultant will partner with the Element <br />Manager(s) to prepare each respective draft Element. <br />~-}ZZ Planning Board= a-r~d-Planning Staff= {Meeting Facilitator?}, and Consultant <br />Conduct Joint Advisory Boards Meeting to "Kick-off" Phase II by Reviewing, <br />Advisory Board Roles and Work Products to be Completed during this Phase. <br />Oct. '07 <br />3} Consultant Meetings with Element Lead Advisory Boards (Max. of 7-meetings, <br />Oct.-Nov. '07}. <br />The Consultant will: <br />a) Present a detailed draft Table of Contents for each Board's respective Element. <br />b~ As a partner with Element Managers, convey gaps and recommendations for <br />filling them. <br />c) Prepare a memorandum summarizing feedback provided by each Board and <br />revise draft Tables of Contents as directed by Element Manager(s), taking advisory <br />board feedback into consideration. <br />d) Convey ELABs preferences for filling paps to Project Management Team. <br />4) Staff Check-in Point with BOCC (Dec. '07) <br />5) Consultant Meetings with Planning Board to provide updates, particularly on <br />the Elements in which the Board does not play a lead role (Max. of 3-meetings, <br />Oct.-Nov. '07). . <br />Note: All underlined text is new. <br />7/11 /07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.