Browse
Search
Agenda - 08-21-2007-4v
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 08-21-2007
>
Agenda - 08-21-2007-4v
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:37:21 PM
Creation date
8/28/2008 11:03:44 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Document Type
Agenda
Agenda Item
4v
Document Relationships
Minutes - 20070821
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3: FormattinglAssembling Comprehensive Plan <br />Contractor: <br />SYNTHESIZE DOCUMENTS <br />• Coordinate with Element Managers to collect any material prepared by county <br />staff to fill identified gaps, as directed by the Project Management Team. <br />• Following standardized formatting guidelines (to be developed by Element <br />Managers and approved by the Project Management Team) and the Table of <br />Contents that were completed for each Element, synthesize documents into a <br />draft Comprehensive Plan. <br />• Adopted County Profile Element shall be inserted into the draft. <br />County Staff: <br />• Complete and convey any material required to fill gaps as instructed by the <br />Project Management Team. <br />• Provide formatting guidelines. <br />• Provide, in agreed upon format, Sections I-V of the Comprehensive Plan, as <br />described in Attachment 1. <br />Deliverables: <br />• 120 black-and-white copies of Draft Comprehensive Plan based on detailed <br />Tables of Contents developed for each Element and .general Table of <br />Contents (i.e. Intro., Planning Principles, Admin., and Monitoring) for overall <br />Comprehensive Plan (Attachment 1). An electronic copy shall also be <br />provided on CD. <br />Schedule: Completed by end of February 2008. <br />Authorized by BOCC on June 26, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.